{"id":1004,"date":"2014-07-01T14:00:59","date_gmt":"2014-07-01T06:00:59","guid":{"rendered":"http:\/\/alfanso10.com\/?p=1004"},"modified":"2017-01-08T14:34:17","modified_gmt":"2017-01-08T06:34:17","slug":"4-8-plet","status":"publish","type":"post","link":"https:\/\/alfanso10.com\/?p=1004","title":{"rendered":"12&#8221; &#038; 4.5&#8221; Pipeline End Termination (PLET)"},"content":{"rendered":"<p>&nbsp;<\/p>\n<p><strong><span style=\"color: #000000;\">COMPANY: EMAS-AMC (SUBCONTRACTOR)<\/span><\/strong><\/p>\n<p><strong><span style=\"color: #000000;\">PROJECT TITLE: Liwan Deepwater Project<\/span><\/strong><\/p>\n<p><strong><span style=\"color: #000000;\">CLIENT: Husky Oil China<\/span><\/strong><\/p>\n<p><strong><span style=\"color: #000000;\">CONTRACTOR: SAIPEM<\/span><\/strong><\/p>\n<p><strong><span style=\"color: #000000;\">LOCATION: CHINA<\/span><\/strong><\/p>\n<p><strong><span style=\"color: #000000;\">YEAR:\u00a02014<\/span><\/strong><\/p>\n<p><strong><span style=\"color: #000000;\">VESSEL: Pipe Lay Barge (PLB) Lewek Centurion<\/span><\/strong><\/p>\n<p><span style=\"color: #000000;\">Lewek Centurion is a self-propelled DP2 S-lay pipeline installation vessel, The vessel measures 146.5m long by 30m wide (35m wide included the external thrusters), with mean operating draft of 7.8 m. The pipe lay ramp is located on the center of the barge and runs the entire length of the barge.<\/span><\/p>\n<p><span style=\"color: #000000;\">The vessel is equipped with one pipe transfer crane and one shipboard crane. The pipe transfer crane has a maximum capacity of 36MT at 30m radius, and the shipboard crane has a maximum capacity of 20MT at 25m knuckle boom. The main crane is a 300 MT Kenz crane at 15-16m radius.<\/span><\/p>\n<p><span style=\"color: #000000;\">LCE is also equipped with 300mT A-Frame and retractable Hang off Platform at port side with 300mT capacity at maximum retraction.<\/span><\/p>\n<p><span style=\"color: #000000;\">All of the vessel accommodation is located above the main deck, and is fully air conditioned with a mess hall and recreational facilities. A helideck is located over the bow superstructure and is capable of accommodating an S61 helicopter.<\/span><\/p>\n<p><strong><span style=\"color: #000000;\">SCOPE OF WORK<\/span><\/strong><\/p>\n<p><span style=\"color: #000000;\">The scope of work for the PLET installation using pipelay installation vessel Lewek Centurion is described below:<\/span><\/p>\n<ul>\n<li><span style=\"color: #000000;\">Recover the pipeline to surface using 300mT A-Frame and cross haul to Main crane<\/span><\/li>\n<li><span style=\"color: #000000;\">Hang-off pipe in Hang-Off Platform<\/span><\/li>\n<li><span style=\"color: #000000;\">Cut-off the laydown head and prepare pipe end for welding<\/span><\/li>\n<li><span style=\"color: #000000;\">Transfer the PLET from the supply vessel to LCE, upend the PLET and position on to\u00a0PLET support frame<\/span><\/li>\n<li><span style=\"color: #000000;\">Align PLET piping with pipeline and perform tie-in weld, NDT and Field Joint Coating<\/span><\/li>\n<li><span style=\"color: #000000;\">Deploy pipeline and PLET to seabed with crane and cross haul to A&amp;R wire.<\/span><\/li>\n<li><span style=\"color: #000000;\">Perform PLET as built survey<\/span><\/li>\n<\/ul>\n<p><span style=\"color: #000000;\">PLET installation is for empty condition. Flooded\u00a0condition is considered as a contingency plan.<\/span><\/p>\n<p><strong><span style=\"color: #000000;\">MY\u00a0INVOLVEMENT:<\/span><\/strong><\/p>\n<p><span style=\"color: #000000;\">I was on board LCE to install both 12&#8221; &amp; 4.5&#8221; PLET<\/span><\/p>\n<p><span style=\"color: #000000;\"><strong><span style=\"text-decoration: underline;\"><span style=\"color: #000000; text-decoration: underline;\">INTRODUCTION<\/span><\/span><\/strong><\/span><\/p>\n<p><span style=\"color: #000000;\">EMAS-AMC was subcontracted by Saipem to perform the installation of pipelines as part of\u00a0Liwan 3-1 Area Facilities Development Project. The works involved installation of two (2) pipelines\u00a0including its pipeline end terminals (PLET\u2019s), four (4) in total, and lifting support of two (2) spools\u00a0which will be installed offshore in South China Sea, approx. 300 km south from Hong Kong in a\u00a0water depth range from 1100 to approx. 1400 meter.\u00a0EMAS-AMC mobilized its pipelay vessel, the Lewek Centurion, end of March 2014 in\u00a0Singapore for an arrival date of 28th April 2014 at latest in Shekou, China, for inward clearances\u00a0and pipe load out. The installation activities were\u00a0estimated to last approximately two (2) months.<\/span><\/p>\n<p align=\"justify\"><span style=\"color: #000000;\"><u>PLET General Data<\/u><\/span><\/p>\n<p><span style=\"color: #000000;\">The PLET main components are piping, valves and its protecting procedure, the hub and its support, the mudmat and the yoke.\u00a0<\/span><\/p>\n<p style=\"text-align: center;\"><span style=\"color: #000000;\">12\u201d PLET Data<\/span><\/p>\n<table style=\"height: 386px;\" width=\"780\">\n<tbody>\n<tr>\n<td style=\"text-align: center;\" rowspan=\"2\" width=\"189\"><span style=\"color: #000000;\">ITEM<\/span><\/td>\n<td style=\"text-align: center;\" colspan=\"2\" width=\"308\"><span style=\"color: #000000;\">12\u201d Pipeline<\/span><\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center;\" width=\"150\"><span style=\"color: #000000;\">PLET 7 (P7)<\/span><\/td>\n<td style=\"text-align: center;\" width=\"158\"><span style=\"color: #000000;\">PLET 8 (P8)<\/span><\/td>\n<\/tr>\n<tr>\n<td width=\"189\"><span style=\"color: #000000;\">Length Overall (LOA)<\/span><\/td>\n<td style=\"text-align: center;\" colspan=\"2\" width=\"308\"><span style=\"color: #000000;\">11.2 m<\/span><\/td>\n<\/tr>\n<tr>\n<td width=\"189\"><span style=\"color: #000000;\">Height, Mudmat folded<\/span><\/td>\n<td style=\"text-align: center;\" colspan=\"2\" width=\"308\"><span style=\"color: #000000;\">3.33<\/span><\/td>\n<\/tr>\n<tr>\n<td width=\"189\"><span style=\"color: #000000;\">Height, Mudmat open<\/span><\/td>\n<td style=\"text-align: center;\" width=\"150\"><span style=\"color: #000000;\">3.13m<\/span><\/td>\n<td style=\"text-align: center;\" width=\"158\"><span style=\"color: #000000;\">3.13<\/span><\/td>\n<\/tr>\n<tr>\n<td width=\"189\"><span style=\"color: #000000;\">Width, Mudmat folded<\/span><\/td>\n<td style=\"text-align: center;\" colspan=\"2\" width=\"308\"><span style=\"color: #000000;\">3.0m<\/span><\/td>\n<\/tr>\n<tr>\n<td width=\"189\"><span style=\"color: #000000;\">Width, Mudmat Open<\/span><\/td>\n<td style=\"text-align: center;\" colspan=\"2\" width=\"308\"><span style=\"color: #000000;\">8.194m<\/span><\/td>\n<\/tr>\n<tr>\n<td width=\"189\"><span style=\"color: #000000;\">Nominal Pipe Size<\/span><\/td>\n<td style=\"text-align: center;\" colspan=\"2\" width=\"308\"><span style=\"color: #000000;\">12 inches<\/span><\/td>\n<\/tr>\n<tr>\n<td width=\"189\"><span style=\"color: #000000;\">Pipe Grade<\/span><\/td>\n<td style=\"text-align: center;\" colspan=\"2\" width=\"308\"><span style=\"color: #000000;\">API 5L X-65<\/span><\/td>\n<\/tr>\n<tr>\n<td width=\"189\"><span style=\"color: #000000;\">Pipe material<\/span><\/td>\n<td style=\"text-align: center;\" width=\"150\"><span style=\"color: #000000;\">Carbon Steel<\/span><\/td>\n<td style=\"text-align: center;\" width=\"158\"><span style=\"color: #000000;\">316L CRA \u2013Clad Lined Carbon Steel<\/span><\/td>\n<\/tr>\n<tr>\n<td width=\"189\"><span style=\"color: #000000;\">Weight, in Air<\/span><\/td>\n<td style=\"text-align: center;\" width=\"150\"><span style=\"color: #000000;\">36.3 mT<\/span><\/td>\n<td style=\"text-align: center;\" width=\"158\"><span style=\"color: #000000;\">36.5 mT<\/span><\/td>\n<\/tr>\n<tr>\n<td width=\"189\"><span style=\"color: #000000;\">Weight, in Water<\/span><\/td>\n<td style=\"text-align: center;\" width=\"150\"><span style=\"color: #000000;\">30.8 mT<\/span><\/td>\n<td style=\"text-align: center;\" width=\"158\"><span style=\"color: #000000;\">30.5 mT<\/span><\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p style=\"text-align: center;\"><span style=\"color: #000000;\">4.5\u201d PLET Data<\/span><\/p>\n<table style=\"height: 288px;\" width=\"637\">\n<tbody>\n<tr>\n<td style=\"text-align: center;\" rowspan=\"2\" width=\"189\"><span style=\"color: #000000;\">ITEM<\/span><\/td>\n<td style=\"text-align: center;\" colspan=\"2\" width=\"308\"><span style=\"color: #000000;\">4.5\u201d Pipeline<\/span><\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center;\" width=\"150\"><span style=\"color: #000000;\">PLET 6 (P6)<\/span><\/td>\n<td style=\"text-align: center;\" width=\"158\"><span style=\"color: #000000;\">PLET 9 (P9)<\/span><\/td>\n<\/tr>\n<tr>\n<td width=\"189\"><span style=\"color: #000000;\">Length Overall (LOA)<\/span><\/td>\n<td style=\"text-align: center;\" colspan=\"2\" width=\"308\"><span style=\"color: #000000;\">7.89 m<\/span><\/td>\n<\/tr>\n<tr>\n<td width=\"189\"><span style=\"color: #000000;\">Overal Height<\/span><\/td>\n<td style=\"text-align: center;\" width=\"150\"><span style=\"color: #000000;\">2.25 m<\/span><\/td>\n<td style=\"text-align: center;\" width=\"158\"><span style=\"color: #000000;\">2.15<\/span><\/td>\n<\/tr>\n<tr>\n<td width=\"189\"><span style=\"color: #000000;\">Overall Width<\/span><\/td>\n<td style=\"text-align: center;\" colspan=\"2\" width=\"308\"><span style=\"color: #000000;\">3.0m<\/span><\/td>\n<\/tr>\n<tr>\n<td width=\"189\"><span style=\"color: #000000;\">Nominal Pipe Size<\/span><\/td>\n<td style=\"text-align: center;\" colspan=\"2\" width=\"308\"><span style=\"color: #000000;\">4.5 inches<\/span><\/td>\n<\/tr>\n<tr>\n<td width=\"189\"><span style=\"color: #000000;\">Pipe Grade<\/span><\/td>\n<td style=\"text-align: center;\" colspan=\"2\" width=\"308\"><span style=\"color: #000000;\">API 5L X-65<\/span><\/td>\n<\/tr>\n<tr>\n<td width=\"189\"><span style=\"color: #000000;\">Pipe material<\/span><\/td>\n<td style=\"text-align: center;\" colspan=\"2\" width=\"308\"><span style=\"color: #000000;\">Carbon Steel<\/span><\/td>\n<\/tr>\n<tr>\n<td width=\"189\"><span style=\"color: #000000;\">Weight, in Air<\/span><\/td>\n<td style=\"text-align: center;\" width=\"150\"><span style=\"color: #000000;\">7.5mT<\/span><\/td>\n<td style=\"text-align: center;\" width=\"158\"><span style=\"color: #000000;\">7.7mT<\/span><\/td>\n<\/tr>\n<tr>\n<td width=\"189\"><span style=\"color: #000000;\">Weight, in Water<\/span><\/td>\n<td style=\"text-align: center;\" width=\"150\"><span style=\"color: #000000;\">6.5mT<\/span><\/td>\n<td style=\"text-align: center;\" width=\"158\"><span style=\"color: #000000;\">6.6mT<\/span><\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p><span style=\"color: #000000;\"><u>PLET Installation Target and\u00a0Installation\u00a0Tolerance<\/u><\/span><\/p>\n<p><span style=\"color: #000000;\">The target coordinate and tolerance for the PLET installation is provided in the following table:<\/span><\/p>\n<table style=\"height: 254px;\" width=\"705\">\n<tbody>\n<tr>\n<td style=\"text-align: center;\" rowspan=\"2\" width=\"62\"><span style=\"color: #000000;\">ITEM<\/span><\/td>\n<td style=\"text-align: center;\" colspan=\"3\" width=\"231\"><span style=\"color: #000000;\">Position<\/span><\/td>\n<td style=\"text-align: center;\" colspan=\"3\" width=\"243\"><span style=\"color: #000000;\">Tolerance<\/span><\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center;\" width=\"78\"><span style=\"color: #000000;\">EAST<\/span><\/td>\n<td style=\"text-align: center;\" width=\"80\"><span style=\"color: #000000;\">NORTH<\/span><\/td>\n<td style=\"text-align: center;\" width=\"73\"><span style=\"color: #000000;\">Heading<\/span><\/td>\n<td style=\"text-align: center;\" width=\"73\"><span style=\"color: #000000;\">Lateral<\/span><\/td>\n<td style=\"text-align: center;\" width=\"96\"><span style=\"color: #000000;\">Longitudinal<\/span><\/td>\n<td style=\"text-align: center;\" width=\"73\"><span style=\"color: #000000;\">Heading<\/span><\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center;\" width=\"62\"><span style=\"color: #000000;\">PLET 6<\/span><\/td>\n<td style=\"text-align: center;\" width=\"78\"><span style=\"color: #000000;\">337748.35<\/span><\/td>\n<td style=\"text-align: center;\" width=\"80\"><span style=\"color: #000000;\">2205914.48<\/span><\/td>\n<td style=\"text-align: center;\" width=\"73\"><span style=\"color: #000000;\">206.5 o<\/span><\/td>\n<td style=\"text-align: center;\" rowspan=\"3\" width=\"73\"><span style=\"color: #000000;\">\u00b13 m<\/span><\/td>\n<td style=\"text-align: center;\" rowspan=\"3\" width=\"96\"><span style=\"color: #000000;\">\u00b15 m<\/span><\/td>\n<td style=\"text-align: center;\" rowspan=\"4\" width=\"73\"><span style=\"color: #000000;\">\u00b12.5 o<\/span><\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center;\" width=\"62\"><span style=\"color: #000000;\">PLET 7<\/span><\/td>\n<td style=\"text-align: center;\" width=\"78\"><span style=\"color: #000000;\">337755.43<\/span><\/td>\n<td style=\"text-align: center;\" width=\"80\"><span style=\"color: #000000;\">2205895.97<\/span><\/td>\n<td style=\"text-align: center;\" width=\"73\"><span style=\"color: #000000;\">209.1 o<\/span><\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center;\" width=\"62\"><span style=\"color: #000000;\">PLET 8<\/span><\/td>\n<td style=\"text-align: center;\" width=\"78\"><span style=\"color: #000000;\">351846.97<\/span><\/td>\n<td style=\"text-align: center;\" width=\"80\"><span style=\"color: #000000;\">2217132.30<\/span><\/td>\n<td style=\"text-align: center;\" width=\"73\"><span style=\"color: #000000;\">168.5 o<\/span><\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center;\" width=\"62\"><span style=\"color: #000000;\">PLET 9<\/span><\/td>\n<td style=\"text-align: center;\" width=\"78\"><span style=\"color: #000000;\">351829.87<\/span><\/td>\n<td style=\"text-align: center;\" width=\"80\"><span style=\"color: #000000;\">2217116.60<\/span><\/td>\n<td style=\"text-align: center;\" width=\"73\"><span style=\"color: #000000;\">168.4 o<\/span><\/td>\n<td style=\"text-align: center;\" width=\"73\"><span style=\"color: #000000;\">\u00b12 m<\/span><\/td>\n<td style=\"text-align: center;\" width=\"96\"><span style=\"color: #000000;\">\u00b13 m<\/span><\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p><u><\/u><strong><span style=\"text-decoration: underline;\"><span style=\"color: #000000; text-decoration: underline;\">FIELD LOCATION<\/span><\/span><\/strong><\/p>\n<p>&nbsp;<\/p>\n<p><span style=\"color: #000000;\"><u><strong><span style=\"text-decoration: underline;\"><span style=\"color: #000000; text-decoration: underline;\">LOADOUT &amp; TRANSPORTATION<\/span><\/span><\/strong><\/u><\/span><\/p>\n<p><u><\/u><span style=\"color: #000000;\"><u><\/u>The PLET was fabricated in China yard<\/span><\/p>\n<p><span style=\"color: #000000;\"><u><strong><span style=\"text-decoration: underline;\"><span style=\"color: #000000; text-decoration: underline;\">PLET INSTALLATION AID<\/span><\/span><\/strong><\/u><\/span><\/p>\n<p><strong><span style=\"color: #000000;\">PLET\u00a0Support\u00a0Frame Stabbing Guide<\/span><\/strong><\/p>\n<p><span style=\"color: #000000;\"><u><\/u>The PLET Support frame was installed on Hang off platform. The main purpose is as a bumper and horizontal support of the PLET while upend and hold by crane prior tie-in to the pipeline.<\/span><\/p>\n<p><span style=\"color: #000000;\">The support frame was equipped with hydraulic jack on top of the frame to adjust the angle of the PLET or adjust the alignment prior install the external clamp. The hydraulic jack had a max. Stroke length of\u00a0700mm with 8.2mT and 6.2mT push pull capacity respectively. This main function of this hydraulic jack is to push forward the PLET to ensure the cone insert the stabbing frame.<\/span><\/p>\n<p><span style=\"color: #000000;\">In order to ensure that PLET was\u00a0aligned with the pipeline below, HOP was also provided with a stabbing guide. The stabbing guide can be adjusted to meet the required installation angle of the pipeline on HOP.<\/span><\/p>\n<p><span style=\"color: #000000;\">This stabbing guide vertical angle can be adjusted from range 0 \u2013 4 deg. by changing pin location on the guide.<\/span><\/p>\n<p><strong><span style=\"color: #000000;\"><span style=\"color: #000000;\">Buoyancy Modules<\/span><\/span><\/strong><\/p>\n<p><span style=\"color: #000000;\">Buoyancy module was required to compensate the weight of the PLET during lowering it to seabed. The net buoyancy required to install the PLET is summarize in below table.<\/span><\/p>\n<table style=\"height: 56px;\" width=\"356\">\n<tbody>\n<tr>\n<td style=\"text-align: center;\" width=\"152\"><span style=\"color: #000000;\">Item<\/span><\/td>\n<td style=\"text-align: center;\" width=\"164\"><span style=\"color: #000000;\">Net Buoyancy (mT)<\/span><\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center;\" width=\"152\"><span style=\"color: #000000;\">12\u201d PLET<\/span><\/td>\n<td style=\"text-align: center;\" width=\"164\"><span style=\"color: #000000;\">27<\/span><\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center;\" width=\"152\"><span style=\"color: #000000;\">4.5\u201d PLET<\/span><\/td>\n<td style=\"text-align: center;\" width=\"164\"><span style=\"color: #000000;\">5.5<\/span><\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p><strong><span style=\"color: #000000;\"><span style=\"color: #000000;\">Hang Off Platform (HOP) &amp; Clamp<\/span><\/span><\/strong><\/p>\n<p><span style=\"color: #000000;\">The main function of the Hang off Platform was\u00a0to carry out full catenary of the pipeline once it is recovered in J-configuration with Max. Load capacity is 300mT.<\/span><\/p>\n<p><span style=\"color: #000000;\">The HOP came\u00a0with a clamp for closing and locking the pipeline via hang off collar clamp. The Hang off collar clamp capacity is max. 300mT.<\/span><\/p>\n<p><span style=\"color: #000000;\">Shim plate was installed on top of hang-off collar to adjust the pipeline angle requirements.<\/span><\/p>\n<p><strong><span style=\"color: #000000;\"><span style=\"color: #000000;\">External Line-Up Clamp<\/span><\/span><\/strong><\/p>\n<p><span style=\"color: #000000;\">Subcontractor designed and fabricated external line up clamp to align pipeline and PLET pup piece prior welding.<\/span><\/p>\n<p><strong><span style=\"color: #000000;\"><span style=\"color: #000000;\">Collar Protector<\/span><\/span><\/strong><\/p>\n<p><span style=\"color: #000000;\">Subcontractor has been design and fabricated collar protector to protect pipe collar during abandon the pipeline in S-Lay mode. This protector was removed once the pipeline rise up on the surface and collar protector above the HOP.<\/span><\/p>\n<p><strong><span style=\"color: #000000;\">PLET Upending Frame<\/span><\/strong><\/p>\n<p><span style=\"color: #000000;\">PLET was transferred from Contractor supply vessel to LCE and landed on PLET upending Frame. PLET upending frame was installed on top of firing line of LCE Deck.<\/span><\/p>\n<p><span style=\"color: #000000;\">PLET mudmat opening, laydown rigging installation, hold back rigging installation and Buoyancy rigging installation to the Yoke was done when PLET sitting on the upending frame. Cutting of the pup piece for P6, P7 and P9 was\u00a0also be done on this stage. Due to height of upending frame is about 4m above the top of the firing line, scaffolding was required as\u00a0this was considered\u00a0as a working at height which required full body harness for those people involved.<\/span><\/p>\n<p><span style=\"color: #000000;\"><u><strong><span style=\"text-decoration: underline;\"><span style=\"color: #000000; text-decoration: underline;\">PLET TIE-IN WELD GENERAL INFORMATION<\/span><\/span><\/strong><\/u><\/span><\/p>\n<p><strong><span style=\"color: #000000;\">Pipe Cutting and Bevelling Machine<\/span><\/strong><\/p>\n<p><span style=\"color: #000000;\"><u><\/u>Prior to performing the cutting of the pipeline pup piece and PLET pup piece, project engineer and welding foreman on board the LCE confirmed the cut length on the pup piece.\u00a0Cutting &amp; Bevelling tool type<\/span><\/p>\n<table style=\"height: 109px;\" width=\"279\">\n<tbody>\n<tr>\n<td style=\"text-align: center;\" width=\"56\"><span style=\"color: #000000;\">Item<\/span><\/td>\n<td style=\"text-align: center;\" width=\"178\"><span style=\"color: #000000;\">Cutting Type<\/span><\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center;\" width=\"56\"><span style=\"color: #000000;\">P6<\/span><\/td>\n<td style=\"text-align: center;\" width=\"178\"><span style=\"color: #000000;\">Hot Cutting<\/span><\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center;\" width=\"56\"><span style=\"color: #000000;\">P7<\/span><\/td>\n<td style=\"text-align: center;\" width=\"178\"><span style=\"color: #000000;\">Hot Cutting<\/span><\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center;\" width=\"56\"><span style=\"color: #000000;\">P8<\/span><\/td>\n<td style=\"text-align: center;\" width=\"178\"><span style=\"color: #000000;\">Cold Cutting<\/span><\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center;\" width=\"56\"><span style=\"color: #000000;\">P9<\/span><\/td>\n<td style=\"text-align: center;\" width=\"178\"><span style=\"color: #000000;\">Hot Cutting<\/span><\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p><strong><span style=\"color: #000000;\">Welding<\/span><\/strong><\/p>\n<p><span style=\"color: #000000;\">Welding was\u00a0performed in accordance with Pipeline Welding Procedure Specification<\/span><\/p>\n<p><span style=\"color: #000000;\">Subcontractor performed welding for carbon steel material (P7) and CONTRACTOR performed welding on CRA Carbon Steel (P8)<\/span><\/p>\n<p><strong><span style=\"color: #000000;\">Weld Inspection<\/span><\/strong><\/p>\n<p><span style=\"color: #000000;\">The tie-in weld was\u00a0inspected with X-Ray for the CRA Pipe conducted by CONTRACTOR and AUT was used by SUBCONTRACTOR for Carbon Steel Pipe.<\/span><\/p>\n<p><strong><span style=\"color: #000000;\">Field Joint Coating<\/span><\/strong><\/p>\n<p><span style=\"color: #000000;\">After completion of the tie-in weld and NDT, the field joint coating was\u00a0applied. SUBCONTRACTOR was\u00a0responsible to commence FJC for Carbon Steel material (P6, P7 &amp; P9) and CONTRACTOR performed FJC for CRA Pipe (P8).<\/span><\/p>\n<p><span style=\"color: #000000;\"><u><strong><span style=\"text-decoration: underline;\"><span style=\"color: #000000; text-decoration: underline;\">PLET INSTALLATION<\/span><\/span><\/strong><\/u><\/span><\/p>\n<p><strong><span style=\"color: #000000;\">General<\/span><\/strong><\/p>\n<p><span style=\"color: #000000;\">PLET Installation covered following activities:<\/span><\/p>\n<ol>\n<li><span style=\"color: #000000;\">LCE Preparation<\/span><\/li>\n<li><span style=\"color: #000000;\">PLET Transfer and Preparation<\/span><\/li>\n<li><span style=\"color: #000000;\">Pipeline Recovery<\/span><\/li>\n<li><span style=\"color: #000000;\">Removal of Laydown head<\/span><\/li>\n<li><span style=\"color: #000000;\">PLET Upending<\/span><\/li>\n<li><span style=\"color: #000000;\">PLET Tie-In<\/span><\/li>\n<li><span style=\"color: #000000;\">PLET Deployment<\/span><\/li>\n<\/ol>\n<p><strong><span style=\"color: #000000;\">Initial Status Prior to Carrying Out Work<\/span><\/strong><\/p>\n<ul>\n<li><span style=\"color: #000000;\">Identified specific work that has to be completed ahead of each task<\/span><\/li>\n<li><span style=\"color: #000000;\">Prepared a specific task plan for each major activity<\/span><\/li>\n<li><span style=\"color: #000000;\">Stage 2 HIRA has been conducted and approved<\/span><\/li>\n<li><span style=\"color: #000000;\">Stage 3 Toolbox talk has been conducted with all personnel involved in the operation<\/span><\/li>\n<\/ul>\n<p><strong><span style=\"color: #000000;\">Lewek Centurion (LCE) Preparation<\/span><\/strong><\/p>\n<p><span style=\"color: #000000;\">Step by step LCE preparation is outlined in table below.<\/span><\/p>\n<ul>\n<li><span style=\"color: #000000;\">HIRA \u00a0stage \u00a02 was \u00a0read \u00a0and \u00a0understood \u00a0by \u00a0all \u00a0personnel involved in this operation.\u00a0Carried out tool box talk (HIRA stage 3)<\/span><\/li>\n<li><span style=\"color: #000000;\">Ensured that PTW (with specific JHA) has been issued and signed off,<\/span><\/li>\n<li><span style=\"color: #000000;\">Cleared area on deck to receive the PLET from cargo barge\/supply vessel (upending support frame)<\/span><\/li>\n<li><span style=\"color: #000000;\">The Welding\/NDT\/FJC Spread required performing the tie-in of the PLET and pipe alignment were\u00a0brought to the hang off platform area and checked\/tested functionally.<\/span><\/li>\n<li><span style=\"color: #000000;\">Checked that all PLET deployment rigging and Buoyancy module rigging installed and ensured that the arrangement as per drawing<\/span><\/li>\n<\/ul>\n<p><strong><span style=\"color: #000000;\">PLET Transfer and Preparation<\/span><\/strong><\/p>\n<p><span style=\"color: #000000;\">Step by step PLET transfer on to LCE is outlined in table below.<\/span><\/p>\n<ul>\n<li><span style=\"color: #000000;\">Brought the supply vessel alongside and secure mooring line to LCE<\/span><\/li>\n<li><span style=\"color: #000000;\">Transferred Riggers and Project Engineer from LCE to PLET supply vessel<\/span><\/li>\n<li><span style=\"color: #000000;\">Project engineer verified \/ re-confirmed the \u201cas-left\u201d status of the PLET from SIT yard. PE signed off checklist<\/span><\/li>\n<li><span style=\"color: #000000;\">Project Engineer visually checked that all ball valve are in closed position<\/span><\/li>\n<li><span style=\"color: #000000;\">Rigger inspected lift rigging to ensure no snag points or loose connection prior to lift and transfer PLET to LCE.<br \/>\n<em>Note: Lifting rigging was\u00a0pre-installed by CONTRACTOR<\/em><\/span><\/li>\n<li><span style=\"color: #000000;\">Removed all sea fastening.<\/span><br \/>\n<span style=\"color: #000000;\"> <em>Note: CONTRACTOR prepared sea fastening which did not need cutting tool to remove Seafastening.<\/em><\/span><\/li>\n<li><span style=\"color: #000000;\">Swung Main Block on top of PLET and lowered down the Hook<\/span><\/li>\n<li><span style=\"color: #000000;\">Connected the lifting rigging to LCE 300mT Crane Main Block. Ensured tag line on each corner of the PLET installed.<\/span><\/li>\n<li><span style=\"color: #000000;\">Lifted up PLET off the supply vessel deck and swung to top of PLET upending frame on top of firing line<\/span><\/li>\n<li><span style=\"color: #000000;\">Lowered PLET on to the upending frame.<\/span><\/li>\n<li><span style=\"color: #000000;\">Released PLET lifting up rigging from PLET lifting point.<\/span><br \/>\n<span style=\"color: #000000;\"> <em> Note: Built\u00a0up scaffolding to reach PLET for preparation work on upending\u00a0frame<br \/>\n: Preparatory work on PLET was considered working at height therefore,\u00a0safety precaution need to be addressed prior start up the job.<\/em><\/span><\/li>\n<li><span style=\"color: #000000;\">Once rigging released, boom up and slew back to Supply vessel to return the rigging.<\/span><\/li>\n<li><span style=\"color: #000000;\">Ensured that PLET mudmat opened and secured back the lock pin<\/span><br \/>\n<span style=\"color: #000000;\"> <em> Note: Ensured the area clear prior open PLET mudmat and used soft sling to control mudmat open up.<\/em><\/span><\/li>\n<li><span style=\"color: #000000;\">Cut-off and continued with pipe end preparation the pup piece on LCE once\u00a0confirmation was received on distance required.<\/span><br \/>\n<span style=\"color: #000000;\"> <em> Note:\u00a0PE\/FE confirmed the length of PLET pup piece to be cut off. No cutting was\u00a0performed on P8 Pup piece<\/em><\/span><\/li>\n<li><span style=\"color: #000000;\">Once the pup piece bevelling completed, commenced NDT (MPI and UT Lamination Check).<\/span><\/li>\n<li><span style=\"color: #000000;\">Once completed, a protection cover over the pipe end was placed.<\/span><\/li>\n<li><span style=\"color: #000000;\">Installed PLET Lifting Rigging, PLET Tilt Rigging, Holding Back Rigging and Buoyancy Rigging to the PLET.\u00a0<\/span><\/li>\n<\/ul>\n<p><strong><span style=\"color: #000000;\">Pipeline Recovery<\/span><\/strong><\/p>\n<p><b><\/b><span style=\"color: #000000;\">When all PLET preparation is completed, the pipe recovery commenced.\u00a0It was important to check before starting the pipeline recovery operation; ROV shall carry out the visual inspection along the pipeline axis and ensure that pipeline is clear from obstruction.<\/span><\/p>\n<ul>\n<li><span style=\"color: #000000;\">Checked with Pre-Pipeline recovery checklist that all recovery preparation tasks has completed.<\/span><\/li>\n<li><span style=\"color: #000000;\">Ensured that the Hang-off clamp has been installed including shim plate on the HOP.<\/span><br \/>\n<span style=\"color: #000000;\"> <em> For 12\u201d PLET required 3 deg departure angle. For 4.5\u201d PLET required 2 deg departure angle.<\/em><\/span><\/li>\n<li><span style=\"color: #000000;\">Deployed ROV to temporary laydown head. Inspected recovery rigging to ensure no foul up of shackle, sling and flotation.<\/span><\/li>\n<li><span style=\"color: #000000;\">ROV visually inspected laydown head and hang off collar. No anomalies reported.<\/span><\/li>\n<li><span style=\"color: #000000;\">Prepared the A&amp;R Wire including Rigging and ROV Hook.<\/span><\/li>\n<li><span style=\"color: #000000;\">Refer to Appendix 2 \u2013 12\u201d &amp; 4.5\u201d Recovery Rigging Arrangement for details.<\/span><\/li>\n<li><span style=\"color: #000000;\">Position the vessel A-Frame above the laydown head and lowering the A&amp;R Wire<\/span><\/li>\n<li><span style=\"color: #000000;\">ROV to connect the recovery rigging to the ROV Hook<\/span><\/li>\n<li><span style=\"color: #000000;\">Once Recovery rigging connected to the ROV Hook, vessel commenced moving and keeping\u00a0 the A&amp;R wire slack. Completed vessel move where standoff distance from laydown head to the A-Frame<\/span><\/li>\n<li><span style=\"color: #000000;\">Following the recovery table, was brought to surface. The A&amp;R centreline axis remained in the plane of the catenary \/ pipeline route.<\/span><\/li>\n<li><span style=\"color: #000000;\">ROV monitored TDP and proximity of pipeline to the existing facilities.<\/span><\/li>\n<li><span style=\"color: #000000;\">During ascent, A&amp;R Operator monitored\u00a0the weight of the pipe. If tension appears to be deviated from recovery table tension. Stop operation. Inform PE\/FE and OM for investigation.<\/span><\/li>\n<li><span style=\"color: #000000;\">The ROV monitored the TDP during ascent<\/span><\/li>\n<li><span style=\"color: #000000;\">A&amp;R brought the laydown head to the surface. Ensured that vessel Hang Off Platform centreline is in the axis with the pipe route. A&amp;R Operator monitored the load closely.<\/span><\/li>\n<li><span style=\"color: #000000;\">Once the Triplate about 1m above the HOP level, held the A&amp;R.<\/span><\/li>\n<li><span style=\"color: #000000;\">Slewed main crane with rigging to HOP level and connected transfer rigging on the Triplate to the shackle on Crane<\/span><\/li>\n<li><span style=\"color: #000000;\">Slowly hooked up the Crane until load transferred from A&amp;R to the Main Crane.<\/span><\/li>\n<li><span style=\"color: #000000;\">Once the pipeline catenary taken by Main Hook, released A&amp;R wire from the recovery rigging.<\/span><\/li>\n<li><span style=\"color: #000000;\">Crane brought in the pipeline in to the Toilet Sheet.<\/span><\/li>\n<li><span style=\"color: #000000;\">Rigger removed Collar protector from the pipeline.<\/span><\/li>\n<li><span style=\"color: #000000;\">Once vessel was\u00a0all stop, Crane Operator lowered\u00a0the pipeline in to the hang-off clamp. The hang off clamp (toilet sheet) is slightly higher above the HOP.<\/span><\/li>\n<li><span style=\"color: #000000;\">Prepared the hang off clamp (toilet sheet) stopper. Once the pipeline inside the hang of clamp, rigger shall close the stopper and lock.<\/span><br \/>\n<span style=\"color: #000000;\"> <em>Note: Unauthorized\u00a0personnel shall not be standing on the HOP during this operation.<\/em><\/span><\/li>\n<li><span style=\"color: #000000;\">Once the pin inserted, Main Hook slowly lowered the pipeline to sit on the hang off clamp (toilet sheet).<br \/>\n<em>Note: Crane wire was slack and did\u00a0not disconnected from the laydown head.<br \/>\n: Hang off clamp (toilet sheet) is provided with the shim plate to meet Catenary departure angle as \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0\u00a0<\/em><em>required in the analysis.<\/em><\/span><\/li>\n<\/ul>\n<p><strong><span style=\"color: #000000;\">Removal of Laydown Head<\/span><\/strong><\/p>\n<ul>\n<li><span style=\"color: #000000;\">Reconfirmed pup piece extension above the hang off collar once the pipeline is hanged off.<\/span><\/li>\n<li><span style=\"color: #000000;\">Marked a distance 50mm below the laydown head girth weld and prepared fitter for cutting off the laydown head.<\/span><\/li>\n<li><span style=\"color: #000000;\">Attached taglines on the laydown head. Ensured that the Crane wire load had minimum tension to ensure the Laydown head did not fall on to the deck.<\/span><\/li>\n<li><span style=\"color: #000000;\">Using cutting tool type provided, fitter cut pipe circumferentially. Cut was 50mm below laydown head girth weld.<\/span><br \/>\n<span style=\"color: #000000;\"> <em> Note:\u00a0 \u00a0cutting\u00a0 \u00a0operation\u00a0 \u00a0to\u00a0 \u00a0commence \u00a0\u00a0circumferentially\u00a0 \u00a0from outboard end.<\/em><\/span><\/li>\n<li><span style=\"color: #000000;\">Fitter commenced cutting through pipe wall.<\/span><\/li>\n<li><span style=\"color: #000000;\">Pipe Fitter continued to commence pipe end bevelling.<\/span><\/li>\n<li><span style=\"color: #000000;\">Once\u00a0 pipe \u00a0end \u00a0bevelling \u00a0completed, \u00a0commenced \u00a0NDT \u00a0(MPI \u00a0and \u00a0UT Lamination check)<\/span><\/li>\n<li><span style=\"color: #000000;\">After pipe end preparation completed, protection cover was placed over the end of the pipe to prevent object from getting in to pipeline or damage the pipe end.<\/span><\/li>\n<li><span style=\"color: #000000;\">Once laydown head was\u00a0removed from pipeline, it was transferred to\u00a0LCE deck (Production Deck)<\/span><\/li>\n<\/ul>\n<p><strong><span style=\"color: #000000;\">PLET Upending<\/span><\/strong><\/p>\n<p><span style=\"color: #000000;\">Prior to commence PLET upending; ensured that the External Line clamp was installed on the pipeline.<\/span><\/p>\n<ul>\n<li><span style=\"color: #000000;\">Rechecked all rigging connected to the PLET and ensured that was\u00a0no snagging of the rigging on PLET<\/span><\/li>\n<li><span style=\"color: #000000;\">Connected PLET Lifting Rigging to Main Block of 300mT Crane<\/span><\/li>\n<li><span style=\"color: #000000;\">Tensioned the rigging. Ensured the PLET is not lift up.<\/span><\/li>\n<li><span style=\"color: #000000;\">Slowly boomed up and lifted the PLET until the aft of the PLET off the upending support frame.<\/span><\/li>\n<li><span style=\"color: #000000;\">Continued lifted up until PLET in vertical position.<\/span><\/li>\n<li><span style=\"color: #000000;\">Lifted up the PLET off upending support frame completely.<\/span><\/li>\n<li><span style=\"color: #000000;\">Slowly swung\u00a0the boom to the HOP.<\/span><\/li>\n<li><span style=\"color: #000000;\">Using tag line, controlled the PLET squarely in front of the Support Frame.<\/span><\/li>\n<li><span style=\"color: #000000;\">Once PLET squarely, slowly hit the bumper on support frame and boomed up slowly to give an angle on PLET while resting on the bumper guide.<\/span><br \/>\n<span style=\"color: #000000;\"> <em>For 12&#8221; &#8211; Stabbing guide set up at 3 degree angle<\/em><\/span><br \/>\n<span style=\"color: #000000;\"> <em>For 4.5&#8221; &#8211; Stabbing guide\u00a0set up at 2 degree angle\u00a0<\/em><\/span><\/li>\n<li><span style=\"color: #000000;\">Hydraulic stroke on support frame started working and push forward the PLET to ensure the cone insert the stabbing frame.<\/span><\/li>\n<li><span style=\"color: #000000;\">At the same time, ensured that PLET pup piece stabbing in to external clamp.<\/span><\/li>\n<li><span style=\"color: #000000;\">Once the cone was inserted the stabbing frame and the pup piece was inserted in the external line up clamp, slowly lowered down the PLET<\/span><\/li>\n<li><span style=\"color: #000000;\">Main Block will held the PLET load.<\/span><br \/>\n<span style=\"color: #000000;\"> <em>Note: Crane Operator to maintain PLET Position all the time<\/em><\/span><\/li>\n<li><span style=\"color: #000000;\">Tied-up holding back rigging to the padeye on top of firing line and tensioned it<\/span><\/li>\n<\/ul>\n<p><strong><span style=\"color: #000000;\">PLET Tie-In Weld<\/span><\/strong><\/p>\n<ul>\n<li><span style=\"color: #000000;\">Removed protection cover from pipeline end<\/span><\/li>\n<li><span style=\"color: #000000;\">External line up clamp was installed to the pipeline prior PLET upending commence.<\/span><\/li>\n<li><span style=\"color: #000000;\">External Line Up Clamp was installed on to pipeline. Ensured the bolts are loose in to the maximum to give more gap between pipe and the inner side of the clamp. The required gap for welding purpose was\u00a0350mm, however, this gap was\u00a0adjustable by tighten the vertical bolts.<\/span><br \/>\n<span style=\"color: #000000;\"><em> Note: Design was\u00a0made to ensure there sufficient gap between pipe and internal line up clamp<\/em><\/span><\/li>\n<li><span style=\"color: #000000;\">Hydraulic Jack on top of Support frame was\u00a0adjusted to align the PLET Pup piece to meet the angle of the PLET while Main Block was \u00a0holding the weight.<\/span><\/li>\n<li><span style=\"color: #000000;\">Slowly lowered main block and inserted\u00a0the PLET pup piece in to external line up clamp.<\/span><\/li>\n<li><span style=\"color: #000000;\">Welder and Welding Engineer checked the line-up of the two pipe ends.<\/span><\/li>\n<li><span style=\"color: #000000;\">Once approved, tightened the bolt and nut of the external line up clamp.<\/span><br \/>\n<span style=\"color: #000000;\"><em> Note: Crane Operator maintained holding the PLET<\/em><\/span><\/li>\n<li><span style=\"color: #000000;\">\u00a0Once External clamp tightened, commenced tie-in welding.<\/span><\/li>\n<li><span style=\"color: #000000;\">Upon \u00a0completion \u00a0of \u00a0the \u00a0root \u00a0and \u00a0hot \u00a0pass, \u00a0welding \u00a0clamp \u00a0was\u00a0removed.<\/span><\/li>\n<li><span style=\"color: #000000;\">NDT the girth weld using AUT or X-Ray<\/span><\/li>\n<li><span style=\"color: #000000;\">Upon acceptance of the weld, appled field joint coating<\/span><\/li>\n<li><span style=\"color: #000000;\">Carried out holiday testing after completion of field joint coating<\/span><\/li>\n<\/ul>\n<p><strong><span style=\"color: #000000;\">PLET Deployment\u00a0<\/span><\/strong><\/p>\n<ul>\n<li><span style=\"color: #000000;\">Once PLET tie-in was completed, removed all equipment used previously from HOP to ensure work space is clear.<\/span><\/li>\n<li><span style=\"color: #000000;\">The crane slightly hooks up to the PLET and gave tension on the crane wire.<\/span><br \/>\n<span style=\"color: #000000;\"><em> Note: Ensure that the PLET is not lift up<\/em><\/span><\/li>\n<li><span style=\"color: #000000;\">Slightly moved forward the main hook to give a slack on PLET tilt rigging while maintaining the tension on the holding back rigging to ensure PLET position is maintain.<\/span><\/li>\n<li><span style=\"color: #000000;\">Deployed Knuckle Boom with rigger on the working basket to the PLET Yoke.<\/span><\/li>\n<li><span style=\"color: #000000;\">Released and secured the Tilt Rigging on the yoke<\/span><\/li>\n<li><span style=\"color: #000000;\">Once the PLET tilt rigging released, restored back the main crane to initial position and released tension from the holding back rigging by slack the chain block on top of the firing line.<\/span><\/li>\n<li><span style=\"color: #000000;\">Retracted in the Hydraulic Stroke on support frame in to a normal position.<\/span><\/li>\n<li><span style=\"color: #000000;\">Secured the Buoy rigging to the HOP<\/span><\/li>\n<li><span style=\"color: #000000;\">Riggers commenced preparation to remove hang off clamp (toilet sheet) stopper.<\/span><\/li>\n<li><span style=\"color: #000000;\">Rigger slid out toilet sheet stopper<\/span><\/li>\n<li><span style=\"color: #000000;\">Once cleared, took up tension on the crane wire<\/span><\/li>\n<li><span style=\"color: #000000;\">Checked pipe movement on hang off clamp (toilet sheet)<\/span><\/li>\n<li><span style=\"color: #000000;\">Increased tension until the pipe collar is off the hang off clamp (toilet sheet).<\/span><\/li>\n<li><span style=\"color: #000000;\">Swung crane away from hang off clamp (toilet sheet) slowly until approx. 1.5m away from the HOP. Crane radius about 14-15m<\/span><\/li>\n<li><span style=\"color: #000000;\">Once the PLET cleared from the hang off platform, set-up the A-Frame to maximum radius as shown in figure below.<\/span><\/li>\n<li><span style=\"color: #000000;\">Lowered the A&amp;R hook until reach HOP deck.<\/span><\/li>\n<li><span style=\"color: #000000;\">Slowly lowered the PLET until transfer rigging at the HOP deck level. Boat hook grabbed the rigging and connect to A&amp;R socket.<\/span><\/li>\n<li><span style=\"color: #000000;\">Once connected, slowly tensioned the A&amp;R by spooling in the wire.<\/span><\/li>\n<li><span style=\"color: #000000;\">Slowly lowered the main block until all load transferred to A&amp;R wire.<\/span><\/li>\n<li><span style=\"color: #000000;\">Once the all load transferred to A&amp;R, lowered the PLET main hook on to HOP.<\/span><\/li>\n<li><span style=\"color: #000000;\">Released the main block by disconnecting rigging on HOP<\/span><\/li>\n<li><span style=\"color: #000000;\">Once the main block released, boom up the crane and slewed to port side to lift up the Buoyancy module.<\/span><\/li>\n<li><span style=\"color: #000000;\">Once the Buoy rigged-up and lifedt up by the crane main block, slewed the crane with Buoyancy module back to HOP.<\/span><\/li>\n<li><span style=\"color: #000000;\">Connected the Buoy rigging at the Buoyancy module to buoy rigging which was secured to HOP<\/span><\/li>\n<li><span style=\"color: #000000;\">Slewed the crane in front on PLET. Maintain the Buoy rigging connected to Yoke is slack.<\/span><\/li>\n<li><span style=\"color: #000000;\">Continued lowered down the PLET using A&amp;R Wire and lowered the Buoy with main Hook.<\/span><\/li>\n<li><span style=\"color: #000000;\">Once PLET and Buoy fully immersed, continued to lower down the PLET and the Buoyancy module until PLET at 150m WD. Held the A&amp;R wire.<\/span><\/li>\n<li><span style=\"color: #000000;\">ROV cut off Yoke secured rigging and release Main Hook from Buoyancy module.<\/span><\/li>\n<li><span style=\"color: #000000;\">Recovered crane main block and continued lowering the PLET<\/span><\/li>\n<li><span style=\"color: #000000;\">Once PLET landed on seabed, ROV cut of rigging and release A&amp;R Wire.<\/span><\/li>\n<li><span style=\"color: #000000;\">A&amp;R Operator recovered the A&amp;R Wire.<\/span><\/li>\n<li><span style=\"color: #000000;\">ROV continued cut the rigging at the Yoke and release the buoyancy module to surface.<\/span><\/li>\n<li><span style=\"color: #000000;\">ROV followed cutting sequence to release Buoyancy Module\u00a0<\/span><\/li>\n<li><span style=\"color: #000000;\">Once buoyancy module on the surface, recovered it using one of Contractor Supply vessel and connected to recovery rigging<\/span><\/li>\n<\/ul>\n<p><strong><span style=\"color: #000000;\">As Laid Survey<\/span><\/strong><\/p>\n<p><span style=\"color: #000000;\">The as-laid survey of the PLET was performed after completion of the above operation. The following data regarding the PLET was\u00a0collected:<\/span><\/p>\n<ul>\n<li><span style=\"color: #000000;\">ROV Visual Inspection of the PLET<\/span><\/li>\n<li><span style=\"color: #000000;\">HUB Position<\/span><\/li>\n<li><span style=\"color: #000000;\">Heading<\/span><\/li>\n<li><span style=\"color: #000000;\">Inclination of the PLET<\/span><\/li>\n<li><span style=\"color: #000000;\">Video Survey<\/span><\/li>\n<\/ul>\n","protected":false},"excerpt":{"rendered":"<p>&nbsp; COMPANY: EMAS-AMC (SUBCONTRACTOR) PROJECT TITLE: Liwan Deepwater Project CLIENT: Husky Oil China CONTRACTOR: SAIPEM LOCATION: CHINA YEAR:\u00a02014 VESSEL: Pipe Lay Barge (PLB) Lewek Centurion Lewek Centurion is a self-propelled &hellip; <a class=\"readmore\" href=\"https:\/\/alfanso10.com\/?p=1004\">Continue Reading \u2192<\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[32],"tags":[],"_links":{"self":[{"href":"https:\/\/alfanso10.com\/index.php?rest_route=\/wp\/v2\/posts\/1004"}],"collection":[{"href":"https:\/\/alfanso10.com\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/alfanso10.com\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/alfanso10.com\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/alfanso10.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=1004"}],"version-history":[{"count":60,"href":"https:\/\/alfanso10.com\/index.php?rest_route=\/wp\/v2\/posts\/1004\/revisions"}],"predecessor-version":[{"id":1306,"href":"https:\/\/alfanso10.com\/index.php?rest_route=\/wp\/v2\/posts\/1004\/revisions\/1306"}],"wp:attachment":[{"href":"https:\/\/alfanso10.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=1004"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/alfanso10.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=1004"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/alfanso10.com\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=1004"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}