{"id":870,"date":"2013-07-31T16:25:16","date_gmt":"2013-07-31T08:25:16","guid":{"rendered":"http:\/\/alfanso10.esy.es\/?p=870"},"modified":"2017-01-23T18:43:23","modified_gmt":"2017-01-23T10:43:23","slug":"chim-sao-field-development","status":"publish","type":"post","link":"https:\/\/alfanso10.com\/?p=870","title":{"rendered":"Chim Sao Field Development"},"content":{"rendered":"<p>&nbsp;<\/p>\n<p><span style=\"color: #000000;\"><strong>COMPANY: EMAS-AMC<\/strong><\/span><\/p>\n<p><span style=\"color: #000000;\"><strong>PROJECT TITLE: Chim Sao Field Development<\/strong><\/span><\/p>\n<p><span style=\"color: #000000;\"><strong>CLIENT:\u00a0Premier Oil Vietnam<\/strong><\/span><\/p>\n<p><span style=\"color: #000000;\"><strong>LOCATION:\u00a0Vietnam<\/strong><\/span><\/p>\n<p><span style=\"color: #000000;\"><strong>YEAR: 2014<\/strong><\/span><\/p>\n<p><span style=\"color: #000000;\"><strong>VESSEL: Diving Support Vessel (DSV) Toisa Paladin<\/strong><\/span><\/p>\n<p><span style=\"color: #000000;\"><strong>SCOPE OF WORK:<\/strong><\/span><\/p>\n<p><span style=\"color: #000000;\">This document describes the 4 x 10\u201d spools installation procedure at PLEM 3 and TPAM ends that will be applied including all preparatory works that need to be performed by all parties involved in operations. Installation of the 10\u201d spools will be carried out by the DSV Toisa Paladin during Phase 3 of the DUA Subsea Development Project.<\/span><\/p>\n<p><span style=\"color: #000000;\"><strong>MY INVOLVEMENT:<\/strong><\/span><\/p>\n<p><span style=\"color: #000000;\">I develop the procedure and executed the spool installation offshore<\/span><\/p>\n<p><span style=\"color: #000000;\"><strong><span style=\"text-decoration: underline;\">INTRODUCTION<\/span><\/strong><\/span><\/p>\n<p><span style=\"color: #000000;\">Premier Oil Vietnam Offshore (POVO) is the operator of the Chim Sao field in Block 12W Offshore Vietnam. The Chim Sao field is located in the Nam Con Son Basin approximately 400km south east of Ho Chi Minh City. The existing Chim Sao development comprises the Lewek Emas FPSO host facility in approximately 94m seawater with a WHP to the South West in approximately 95m water depth, the WHP being minimal facilities and controlled from the Lewek Emas FPSO. Infield flowlines transfer produced fluids from the WHP to the FPSO, and utilities (water for water injection, gas for gas lift and controls umbilical) from the FPSO to the WHP.<\/span><\/p>\n<p><span style=\"color: #000000;\">POVO intends to develop the Dua subsea field as a subsea tieback to the Lewek Emas FPSO. The Dua development comprises a 17km subsea tieback of 3 wells with dual 10\u201d flowlines, with the production flowline requiring thermal insulation to minimise the volume of waxing tendency of the crude and the criteria adopted to mitigate wax build up. The second (uninsulated) pigging\/gas lift flowline is provided to allow round trip pigging and also for gas lift capacility.<\/span><\/p>\n<p><span style=\"color: #000000;\">POVO has awarded the EPCI of Dua development to PTSC and PTSC has in turn awarded the T&amp;I scope to EMAS AMC.<\/span><\/p>\n<p><span style=\"color: #000000;\">The Dua Subsea Development Project is integrated into the Block12W infrastructure and is shown schematically in Figure 1-1.<\/span><\/p>\n<p><span style=\"color: #000000;\"><strong>Installation Data<\/strong><\/span><\/p>\n<p align=\"justify\"><span style=\"color: #000000;\"><u>TPAM (Twin Pipeline Active Manifold) and PLEM<\/u><\/span><\/p>\n<p><span style=\"color: #000000;\">Two 10\u201d spools will be tied in to PLEM 3 that will be within 250m radius from the FPSO turret nominal centreline and two 10\u201d spools will be tied in to the TPAM, which will be approximately 17 km away from the FPSO turret. The proposed coordinates for the centreline of PLEM3 and TPAM are defined in Table 4.1.1.<\/span><\/p>\n<table>\n<tbody>\n<tr>\n<td width=\"167\"><span style=\"color: #000000;\"><strong>Object<\/strong><\/span><\/td>\n<td width=\"169\"><span style=\"color: #000000;\"><strong>Easting (m)<\/strong><\/span><\/td>\n<td width=\"171\"><span style=\"color: #000000;\"><strong>Northing (m)<\/strong><\/span><\/td>\n<td width=\"153\"><span style=\"color: #000000;\"><strong>Heading (<\/strong><strong>\u00ba from N)<\/strong><\/span><\/td>\n<\/tr>\n<tr>\n<td width=\"167\"><span style=\"color: #000000;\">PLEM<\/span><\/td>\n<td width=\"169\"><span style=\"color: #000000;\">203,442.00<\/span><\/td>\n<td width=\"171\"><span style=\"color: #000000;\">812,840.00<\/span><\/td>\n<td width=\"153\"><span style=\"color: #000000;\">60.1<\/span><\/td>\n<\/tr>\n<tr>\n<td width=\"167\"><span style=\"color: #000000;\">TPAM<\/span><\/td>\n<td width=\"169\"><span style=\"color: #000000;\">214,746.77<\/span><\/td>\n<td width=\"171\"><span style=\"color: #000000;\">824,995.43<\/span><\/td>\n<td width=\"153\"><span style=\"color: #000000;\">45.0<\/span><\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p><span style=\"color: #000000;\"><u>10&#8221; Spools at PLEM 3<\/u><\/span><\/p>\n<table>\n<tbody>\n<tr>\n<td width=\"193\"><span style=\"color: #000000;\">\u00a0<\/span><\/td>\n<td width=\"239\"><span style=\"color: #000000;\">Production Pipeline<\/span><\/td>\n<td width=\"227\"><span style=\"color: #000000;\">Pigging\/ Gas Lift Pipeline<\/span><\/td>\n<\/tr>\n<tr>\n<td width=\"193\"><span style=\"color: #000000;\">Water Depth<\/span><\/td>\n<td colspan=\"2\" width=\"466\"><span style=\"color: #000000;\">93.2m LAT<\/span><\/td>\n<\/tr>\n<tr>\n<td width=\"193\"><span style=\"color: #000000;\">Spool Dia. and wall thickness<\/span><\/td>\n<td colspan=\"2\" width=\"466\"><span style=\"color: #000000;\">273.1mm OD. X 15.9mm WT (seamless linepipe)<\/span><\/p>\n<p><span style=\"color: #000000;\">273.1mm OD. X 18.3mm WT (bend)<\/span><\/td>\n<\/tr>\n<tr>\n<td width=\"193\"><span style=\"color: #000000;\">Anti-Corrosion Coating<\/span><\/td>\n<td width=\"239\"><span style=\"color: #000000;\">35.3mm insulation coating on straights<\/span><\/p>\n<p><span style=\"color: #000000;\">26mm SPU coatings on bends<\/span><\/td>\n<td width=\"227\"><span style=\"color: #000000;\">2.5mm 3LPE coating<\/span><\/td>\n<\/tr>\n<tr>\n<td width=\"193\"><span style=\"color: #000000;\">Concrete Weight Coating<\/span><\/td>\n<td colspan=\"2\" width=\"466\"><span style=\"color: #000000;\">N.A.<\/span><\/td>\n<\/tr>\n<tr>\n<td width=\"193\"><span style=\"color: #000000;\">Steel Material<\/span><\/td>\n<td colspan=\"2\" width=\"466\"><span style=\"color: #000000;\">API 5L Grade X65 (SMYS @ T\u226450\u00ba =448MPa)<\/span><\/td>\n<\/tr>\n<tr>\n<td width=\"193\"><span style=\"color: #000000;\">Max. Design Length<\/span><\/td>\n<td width=\"239\"><span style=\"color: #000000;\">64.1m<\/span><\/td>\n<td width=\"227\"><span style=\"color: #000000;\">66.9m<\/span><\/td>\n<\/tr>\n<tr>\n<td width=\"193\"><span style=\"color: #000000;\">Bend<\/span><\/td>\n<td width=\"239\"><span style=\"color: #000000;\">90 deg. 5D bend x 1ea<\/span><\/p>\n<p><span style=\"color: #000000;\">79.46 deg. 5D bend x 1 ea<\/span><\/p>\n<p><span style=\"color: #000000;\">30 deg. 5D bend x 2 ea<\/span><\/td>\n<td width=\"227\"><span style=\"color: #000000;\">90 deg. 5D bend x 1ea<\/span><\/p>\n<p><span style=\"color: #000000;\">70.87 deg. 5D bend x 1 ea<\/span><\/p>\n<p><span style=\"color: #000000;\">30 deg. 5D bend x 2 ea<\/span><\/td>\n<\/tr>\n<tr>\n<td width=\"193\"><span style=\"color: #000000;\">Flange<\/span><\/td>\n<td colspan=\"2\" width=\"466\"><span style=\"color: #000000;\">10\u201d swivel ASME B16.5 Class 1500# 241.3mm dia. bore (to pipeline)<\/span><\/p>\n<p><span style=\"color: #000000;\">10\u201d swivel ASME B16.5 Class 1500# 236.5mm dia. bore (to PLEM 3)<\/span><\/td>\n<\/tr>\n<tr>\n<td width=\"193\"><span style=\"color: #000000;\">Bolt\/ Nut<\/span><\/td>\n<td colspan=\"2\" width=\"466\"><span style=\"color: #000000;\">1-7\/8\u201d x 610mm lg. studbolts A320M L7M c\/w 2 nuts<\/span><\/td>\n<\/tr>\n<tr>\n<td width=\"193\"><span style=\"color: #000000;\">Gasket<\/span><\/td>\n<td colspan=\"2\" width=\"466\"><span style=\"color: #000000;\">R54 Octagonal gasket drilled to prevent hydrolock- ANSI B16.20<\/span><\/td>\n<\/tr>\n<tr>\n<td width=\"193\"><span style=\"color: #000000;\">Air Weight (Empty)<\/span><\/td>\n<td width=\"239\"><span style=\"color: #000000;\">9.1 T<\/span><\/td>\n<td width=\"227\"><span style=\"color: #000000;\">7.7 MT<\/span><\/td>\n<\/tr>\n<tr>\n<td width=\"193\"><span style=\"color: #000000;\">Submerged weight (Free Flooded)<\/span><\/td>\n<td width=\"239\"><span style=\"color: #000000;\">7.9 MT<\/span><\/td>\n<td width=\"227\"><span style=\"color: #000000;\">6.7 MT<\/span><\/td>\n<\/tr>\n<tr>\n<td width=\"193\"><span style=\"color: #000000;\">Section<\/span><\/td>\n<td width=\"239\"><span style=\"color: #000000;\">1<\/span><\/td>\n<td width=\"227\"><span style=\"color: #000000;\">1<\/span><\/td>\n<\/tr>\n<tr>\n<td width=\"193\"><span style=\"color: #000000;\">Anode<\/span><\/td>\n<td colspan=\"2\" width=\"466\"><span style=\"color: #000000;\">N.A.<\/span><\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>&nbsp;<\/p>\n<p><span style=\"color: #000000;\"><strong>Spool Installation\u00a0Sequence<\/strong><\/span><\/p>\n<p><span style=\"color: #000000;\">4 nos. of 10\u201d spools will be installed as per Table 7.2.1.<\/span><\/p>\n<table>\n<tbody>\n<tr>\n<td width=\"90\"><span style=\"color: #000000;\"><strong>Sequence<\/strong><\/span><\/td>\n<td width=\"103\"><span style=\"color: #000000;\"><strong>Spool No<\/strong><\/span><\/td>\n<td width=\"324\"><span style=\"color: #000000;\"><strong>Description<\/strong><\/span><\/td>\n<\/tr>\n<tr>\n<td width=\"90\"><span style=\"color: #000000;\">#1<\/span><\/td>\n<td width=\"103\"><span style=\"color: #000000;\">Spool #1<\/span><\/td>\n<td width=\"324\"><span style=\"color: #000000;\">10\u2019\u2019 Production Pipeline Spool @ PLEM 3<\/span><\/td>\n<\/tr>\n<tr>\n<td width=\"90\"><span style=\"color: #000000;\">#2<\/span><\/td>\n<td width=\"103\"><span style=\"color: #000000;\">Spool #2<\/span><\/td>\n<td width=\"324\"><span style=\"color: #000000;\">10\u2019\u2019 Pigging\/Gas Lift Pipeline Spool @ PLEM 3<\/span><\/td>\n<\/tr>\n<tr>\n<td width=\"90\"><span style=\"color: #000000;\">#3<\/span><\/td>\n<td width=\"103\"><span style=\"color: #000000;\">Spool #3<\/span><\/td>\n<td width=\"324\"><span style=\"color: #000000;\">10\u2019\u2019 Production Pipeline Spool @ TPAM<\/span><\/td>\n<\/tr>\n<tr>\n<td width=\"90\"><span style=\"color: #000000;\">#4<\/span><\/td>\n<td width=\"103\"><span style=\"color: #000000;\">Spool #4<\/span><\/td>\n<td width=\"324\"><span style=\"color: #000000;\">10\u2019\u2019 Pigging\/Gas Lift Pipeline Spool @ TPAM<\/span><\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p><span style=\"color: #000000;\"><u><strong>FIELD \u00a0&amp; TRANSPORTATION<\/strong><\/u><\/span><\/p>\n<p>&nbsp;<\/p>\n<p><span style=\"color: #000000;\"><u><strong>LOADOUT &amp; TRANSPORTATION<\/strong><\/u><\/span><\/p>\n<p><span style=\"color: #000000;\"><strong>General<\/strong><\/span><\/p>\n<p><span style=\"color: #000000;\">The 10\u201d spools will be fabricated by PTSC in Vung Tau, Vietnam. Upon completion of fabrication, field joint coating and NDT, the 10\u201d spools will be loaded onto 250\u2019 cargo barge in PTSC Jetty, Vung Tau. Load out and tie-down of the 10\u201d spools will be done by PTSC. Lifting rigging will be pre-rigged during load out. Voyage summary is presented in Table 5.1.1.<\/span><\/p>\n<table style=\"height: 177px;\" width=\"694\">\n<tbody>\n<tr>\n<td width=\"80\"><span style=\"color: #000000;\"><strong><em>Voyage<\/em><\/strong><\/span><\/td>\n<td width=\"128\"><span style=\"color: #000000;\"><strong><em>Barge<\/em><\/strong><\/span><\/td>\n<td width=\"132\"><span style=\"color: #000000;\"><strong><em>Ocean Tug<\/em><\/strong><\/span><\/td>\n<td width=\"217\"><span style=\"color: #000000;\"><strong><em>Main Cargo<\/em><\/strong><\/span><\/td>\n<\/tr>\n<tr>\n<td width=\"80\"><span style=\"color: #000000;\">1<\/span><\/td>\n<td width=\"128\"><span style=\"color: #000000;\">\u201cMaritime Swift\u201d<sup>1<\/sup><\/span><\/p>\n<p><span style=\"color: #000000;\">(250 ft x 80 ft)<\/span><\/p>\n<p><span style=\"color: #000000;\">\u00a0<\/span><\/td>\n<td width=\"132\"><span style=\"color: #000000;\">\u201cOcean Union\u201d<sup> 1<\/sup><\/span><\/p>\n<p><span style=\"color: #000000;\">(65T Bollard Pull)<\/span><\/p>\n<p><span style=\"color: #000000;\">\u00a0<\/span><\/td>\n<td width=\"217\"><span style=\"color: #000000;\">1) 10\u201d tie-in spools x 4 ea.<\/span><\/p>\n<p><span style=\"color: #000000;\">Cargo weight is approx. 40MT<\/span><\/p>\n<p><span style=\"color: #000000;\">\u00a0<\/span><\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p><span style=\"color: #000000;\">Table 5.1.1: Voyage Summary<\/span><\/p>\n<p><span style=\"color: #000000;\">Notes:<\/span><\/p>\n<ol>\n<li><span style=\"color: #000000;\">Barge and tug have not been confirmed. Actual barge and tug will be updated after confirmation of barge and tugs charter party.<\/span><\/li>\n<li><span style=\"color: #000000;\">Material barge layout and seafastening for the spools are covered in Ref. \/41.\/<\/span><\/li>\n<\/ol>\n<p><span style=\"color: #000000;\"><strong>Transportation &amp; Seafastening Configuration<\/strong><\/span><\/p>\n<p><span style=\"color: #000000;\">The material barge detailed ballasting condition (to be ballasted to 2m freeboard) and seafastening of the spools transportation barge will be performed in accordance with Ref. \/46.\/. Details of the transportation is presented in Ref. \/41.\/. For spools transportation and seafastening drawings, refer to drawing no. 12012-AMC-DUA-ME-DW-1910.<\/span><\/p>\n<p><span style=\"color: #000000;\"><u><strong>SPOOL INSTALLATION AIDS<\/strong><\/u><\/span><\/p>\n<p><span style=\"color: #000000;\">This section details the major equipment and installation aids required for the spools installation. They are listed in Table 6.4.1.<\/span><\/p>\n<table style=\"height: 5676px;\" width=\"819\">\n<tbody>\n<tr>\n<td colspan=\"4\" width=\"631\"><span style=\"color: #000000;\"><strong>FIM<\/strong><\/span><\/td>\n<\/tr>\n<tr>\n<td width=\"52\"><span style=\"color: #000000;\">Item<\/span><\/td>\n<td width=\"328\"><span style=\"color: #000000;\">Description<\/span><\/td>\n<td width=\"60\"><span style=\"color: #000000;\">Qty<sup>1<\/sup><\/span><\/td>\n<td width=\"192\"><span style=\"color: #000000;\">Remarks<\/span><\/td>\n<\/tr>\n<tr>\n<td width=\"52\"><span style=\"color: #000000;\">1<\/span><\/td>\n<td width=\"328\"><span style=\"color: #000000;\">10\u201d tie-in spool<\/span><\/td>\n<td width=\"60\"><span style=\"color: #000000;\">4<\/span><\/td>\n<td width=\"192\"><span style=\"color: #000000;\">Fabricated, field joint coated and NDT by PTSC. Loadout on 250\u2019 cargo barge<\/span><\/td>\n<\/tr>\n<tr>\n<td width=\"52\"><span style=\"color: #000000;\">2<\/span><\/td>\n<td width=\"328\"><span style=\"color: #000000;\">1-7\/8\u201d x 610mm lg. stud bolts<\/span><\/td>\n<td width=\"60\"><span style=\"color: #000000;\">96<\/span><\/td>\n<td width=\"192\"><span style=\"color: #000000;\">Loadout on 250\u2019 cargo barge<\/span><\/td>\n<\/tr>\n<tr>\n<td width=\"52\"><span style=\"color: #000000;\">3<\/span><\/td>\n<td width=\"328\"><span style=\"color: #000000;\">R54 Octagonal gasket<\/span><\/td>\n<td width=\"60\"><span style=\"color: #000000;\">8<\/span><\/td>\n<td width=\"192\"><span style=\"color: #000000;\">Loadout on 250\u2019 cargo barge<\/span><\/td>\n<\/tr>\n<tr>\n<td colspan=\"4\" width=\"631\"><span style=\"color: #000000;\"><strong>Equipment and Installation Aids<\/strong><\/span><\/td>\n<\/tr>\n<tr>\n<td width=\"52\"><span style=\"color: #000000;\">Item<\/span><\/td>\n<td width=\"328\"><span style=\"color: #000000;\">Description<\/span><\/td>\n<td width=\"60\"><span style=\"color: #000000;\">Qty<sup>1<\/sup><\/span><\/td>\n<td width=\"192\"><span style=\"color: #000000;\">Remarks<\/span><\/td>\n<\/tr>\n<tr>\n<td width=\"52\"><span style=\"color: #000000;\">1<\/span><\/td>\n<td width=\"328\"><span style=\"color: #000000;\">Yokohama Fenders (3.3m x 6.5m)<\/span><\/td>\n<td width=\"60\"><span style=\"color: #000000;\">4<\/span><\/td>\n<td width=\"192\"><span style=\"color: #000000;\">\u00a0<\/span><\/td>\n<\/tr>\n<tr>\n<td width=\"52\"><span style=\"color: #000000;\">2<\/span><\/td>\n<td width=\"328\"><span style=\"color: #000000;\">Mooring rope<\/span><\/td>\n<td width=\"60\"><span style=\"color: #000000;\">1 lot<\/span><\/td>\n<td width=\"192\"><span style=\"color: #000000;\">\u00a0<\/span><\/td>\n<\/tr>\n<tr>\n<td width=\"52\"><span style=\"color: #000000;\">3<\/span><\/td>\n<td width=\"328\"><span style=\"color: #000000;\">Cutting torch<\/span><\/td>\n<td width=\"60\"><span style=\"color: #000000;\">1 set<\/span><\/td>\n<td width=\"192\"><span style=\"color: #000000;\">\u00a0<\/span><\/td>\n<\/tr>\n<tr>\n<td width=\"52\"><span style=\"color: #000000;\">4<\/span><\/td>\n<td width=\"328\"><span style=\"color: #000000;\">Diver\u2019s A-frame<\/span><\/td>\n<td width=\"60\"><span style=\"color: #000000;\">2<\/span><\/td>\n<td width=\"192\"><span style=\"color: #000000;\">\u00a0<\/span><\/td>\n<\/tr>\n<tr>\n<td width=\"52\"><span style=\"color: #000000;\">5<\/span><\/td>\n<td width=\"328\"><span style=\"color: #000000;\">Diver\u2019s working basket<\/span><\/td>\n<td width=\"60\"><span style=\"color: #000000;\">1<\/span><\/td>\n<td width=\"192\"><span style=\"color: #000000;\">\u00a0<\/span><\/td>\n<\/tr>\n<tr>\n<td width=\"52\"><span style=\"color: #000000;\">6<\/span><\/td>\n<td width=\"328\"><span style=\"color: #000000;\">Broco<\/span><\/td>\n<td width=\"60\"><span style=\"color: #000000;\">1 set<\/span><\/td>\n<td width=\"192\"><span style=\"color: #000000;\">\u00a0<\/span><\/td>\n<\/tr>\n<tr>\n<td width=\"52\"><span style=\"color: #000000;\">7<\/span><\/td>\n<td width=\"328\"><span style=\"color: #000000;\">Hydratight<\/span><\/td>\n<td width=\"60\"><span style=\"color: #000000;\">1 set<\/span><\/td>\n<td width=\"192\"><span style=\"color: #000000;\">\u00a0<\/span><\/td>\n<\/tr>\n<tr>\n<td width=\"52\"><span style=\"color: #000000;\">8<\/span><\/td>\n<td width=\"328\"><span style=\"color: #000000;\">Fishing rope<\/span><\/td>\n<td width=\"60\"><span style=\"color: #000000;\">1 lg<\/span><\/td>\n<td width=\"192\"><span style=\"color: #000000;\">\u00a0<\/span><\/td>\n<\/tr>\n<tr>\n<td width=\"52\"><span style=\"color: #000000;\">9<\/span><\/td>\n<td width=\"328\"><span style=\"color: #000000;\">AF 2-15\/16 flogging spanner<\/span><\/td>\n<td width=\"60\"><span style=\"color: #000000;\">2<\/span><\/td>\n<td width=\"192\"><span style=\"color: #000000;\">For spool installation<\/span><\/td>\n<\/tr>\n<tr>\n<td width=\"52\"><span style=\"color: #000000;\">10<\/span><\/td>\n<td width=\"328\"><span style=\"color: #000000;\">Diver subsea tool box<\/span><\/td>\n<td width=\"60\"><span style=\"color: #000000;\">1<\/span><\/td>\n<td width=\"192\"><span style=\"color: #000000;\">\u00a0<\/span><\/td>\n<\/tr>\n<tr>\n<td width=\"52\"><span style=\"color: #000000;\">11<\/span><\/td>\n<td width=\"328\"><span style=\"color: #000000;\">Nut splitter (size TBC)<\/span><\/td>\n<td width=\"60\"><span style=\"color: #000000;\">TBC<\/span><\/td>\n<td width=\"192\"><span style=\"color: #000000;\">\u00a0<\/span><\/td>\n<\/tr>\n<tr>\n<td width=\"52\"><span style=\"color: #000000;\">12<\/span><\/td>\n<td width=\"328\"><span style=\"color: #000000;\">Spreader Bar<\/span><\/td>\n<td width=\"60\"><span style=\"color: #000000;\">1 lgth<\/span><\/td>\n<td width=\"192\"><span style=\"color: #000000;\">\u00a0<\/span><\/td>\n<\/tr>\n<tr>\n<td width=\"52\"><span style=\"color: #000000;\">13<\/span><\/td>\n<td width=\"328\"><span style=\"color: #000000;\">0.5MT air bags<\/span><\/td>\n<td width=\"60\"><span style=\"color: #000000;\">\u00a0<\/span><\/td>\n<td width=\"192\"><span style=\"color: #000000;\">\u00a0<\/span><\/td>\n<\/tr>\n<tr>\n<td width=\"52\"><span style=\"color: #000000;\">14<\/span><\/td>\n<td width=\"328\"><span style=\"color: #000000;\">10MT clump weight<\/span><\/td>\n<td width=\"60\"><span style=\"color: #000000;\">\u00a0<\/span><\/td>\n<td width=\"192\"><span style=\"color: #000000;\">\u00a0<\/span><\/td>\n<\/tr>\n<tr>\n<td colspan=\"4\" width=\"631\"><span style=\"color: #000000;\">Lift Rigging for Spreader Bar<\/span><\/p>\n<p><span style=\"color: #000000;\">(Refer to 12012-AMC-DUA-ME-DW-2030\u201d Spreader Bar &amp; Rigging Detail (From Crane Hook to Spreader Bar)\u201d<\/span><\/td>\n<\/tr>\n<tr>\n<td width=\"52\"><span style=\"color: #000000;\">\u00a0<\/span><\/td>\n<td width=\"328\"><span style=\"color: #000000;\">\u00a0<\/span><\/td>\n<td width=\"60\"><span style=\"color: #000000;\">\u00a0<\/span><\/td>\n<td width=\"192\"><span style=\"color: #000000;\">\u00a0<\/span><\/td>\n<\/tr>\n<tr>\n<td colspan=\"4\" width=\"631\"><span style=\"color: #000000;\">Lift Rigging for 10\u201d Production Pipeline Spool No. 1 at PLEM 3<\/span><\/p>\n<p><span style=\"color: #000000;\">(Refer to 12012-AMC-DUA-ME-DW-2034 10\u201d Production Pipeline Spool No. 1 at PLEM 3 Lift Rigging Arrangement)<\/span><\/td>\n<\/tr>\n<tr>\n<td width=\"52\"><span style=\"color: #000000;\">1<\/span><\/td>\n<td width=\"328\"><span style=\"color: #000000;\">Wire Rope Sling \u2013 1 (26mm dia., 5.73m long)<\/span><\/td>\n<td width=\"60\"><span style=\"color: #000000;\">1<\/span><\/td>\n<td rowspan=\"11\" width=\"192\"><span style=\"color: #000000;\">Pre-rigged to spool by PTSC<\/span><\/td>\n<\/tr>\n<tr>\n<td width=\"52\"><span style=\"color: #000000;\">2<\/span><\/td>\n<td width=\"328\"><span style=\"color: #000000;\">Wire Rope Sling \u2013 2 (26mm, 5.74m long)<\/span><\/td>\n<td width=\"60\"><span style=\"color: #000000;\">1<\/span><\/td>\n<\/tr>\n<tr>\n<td width=\"52\"><span style=\"color: #000000;\">3<\/span><\/td>\n<td width=\"328\"><span style=\"color: #000000;\">Wire Rope Sling \u2013 3 (26mm, 6.11m long)<\/span><\/td>\n<td width=\"60\"><span style=\"color: #000000;\">1<\/span><\/td>\n<\/tr>\n<tr>\n<td width=\"52\"><span style=\"color: #000000;\">4<\/span><\/td>\n<td width=\"328\"><span style=\"color: #000000;\">Wire Rope Sling \u2013 4 (26mm, 7.75m long)<\/span><\/td>\n<td width=\"60\"><span style=\"color: #000000;\">1<\/span><\/td>\n<\/tr>\n<tr>\n<td width=\"52\"><span style=\"color: #000000;\">5<\/span><\/td>\n<td width=\"328\"><span style=\"color: #000000;\">Wire Rope Sling \u2013 5 (26mm, 5.04m long)<\/span><\/td>\n<td width=\"60\"><span style=\"color: #000000;\">1<\/span><\/td>\n<\/tr>\n<tr>\n<td width=\"52\"><span style=\"color: #000000;\">6<\/span><\/td>\n<td width=\"328\"><span style=\"color: #000000;\">Wire Rope Sling \u2013 6 (26mm, 6.39m long)<\/span><\/td>\n<td width=\"60\"><span style=\"color: #000000;\">1<\/span><\/td>\n<\/tr>\n<tr>\n<td width=\"52\"><span style=\"color: #000000;\">7<\/span><\/td>\n<td width=\"328\"><span style=\"color: #000000;\">Shackle Crosby G-2130 (SWL 17 MT)<\/span><\/td>\n<td width=\"60\"><span style=\"color: #000000;\">3<\/span><\/td>\n<\/tr>\n<tr>\n<td width=\"52\"><span style=\"color: #000000;\">8<\/span><\/td>\n<td width=\"328\"><span style=\"color: #000000;\">Master Link \u2018A-342 Alloy\u2019 (SWL 16.43 MT)<\/span><\/td>\n<td width=\"60\"><span style=\"color: #000000;\">3<\/span><\/td>\n<\/tr>\n<tr>\n<td width=\"52\"><span style=\"color: #000000;\">9<\/span><\/td>\n<td width=\"328\"><span style=\"color: #000000;\">Shackle Crosby G-2130 (SWL 8.5 MT)<\/span><\/td>\n<td width=\"60\"><span style=\"color: #000000;\">7<\/span><\/td>\n<\/tr>\n<tr>\n<td width=\"52\"><span style=\"color: #000000;\">10<\/span><\/td>\n<td width=\"328\"><span style=\"color: #000000;\">Round Sling (To double choke around spool, 3m long)<\/span><\/td>\n<td width=\"60\"><span style=\"color: #000000;\">6<\/span><\/td>\n<\/tr>\n<tr>\n<td width=\"52\"><span style=\"color: #000000;\">11<\/span><\/td>\n<td width=\"328\"><span style=\"color: #000000;\">Chain Block \u2018Maxi Lift MC-10\u2019 (1m long)<\/span><\/td>\n<td width=\"60\"><span style=\"color: #000000;\">5<\/span><\/td>\n<\/tr>\n<tr>\n<td colspan=\"4\" width=\"631\"><span style=\"color: #000000;\">Lift Rigging for 10\u201d Pigging\/Gas Lift Spool No. 2 at PLEM 3<\/span><\/p>\n<p><span style=\"color: #000000;\">(Refer to 12012-AMC-DUA-ME-DW-2035 10\u201d Pigging\/Gas Lift Spool No. 2 at PLEM 3 Lift Rigging Arrangement)<\/span><\/td>\n<\/tr>\n<tr>\n<td width=\"52\"><span style=\"color: #000000;\">1<\/span><\/td>\n<td width=\"328\"><span style=\"color: #000000;\">Wire Rope Sling \u2013 1 (26mm dia., 5.12m long)<\/span><\/td>\n<td width=\"60\"><span style=\"color: #000000;\">1<\/span><\/td>\n<td rowspan=\"12\" width=\"192\">&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p><span style=\"color: #000000;\">Pre-rigged to spool by PTSC<\/span><\/p>\n<p>&nbsp;<\/p>\n<p><span style=\"color: #000000;\">\u00a0<\/span><\/td>\n<\/tr>\n<tr>\n<td width=\"52\"><span style=\"color: #000000;\">2<\/span><\/td>\n<td width=\"328\"><span style=\"color: #000000;\">Wire Rope Sling \u2013 2 (26mm, 5.38m long)<\/span><\/td>\n<td width=\"60\"><span style=\"color: #000000;\">1<\/span><\/td>\n<\/tr>\n<tr>\n<td width=\"52\"><span style=\"color: #000000;\">3<\/span><\/td>\n<td width=\"328\"><span style=\"color: #000000;\">Wire Rope Sling \u2013 3 (26mm, 9.88m long)<\/span><\/td>\n<td width=\"60\"><span style=\"color: #000000;\">1<\/span><\/td>\n<\/tr>\n<tr>\n<td width=\"52\"><span style=\"color: #000000;\">4<\/span><\/td>\n<td width=\"328\"><span style=\"color: #000000;\">Wire Rope Sling \u2013 4 (26mm, 4.14m long)<\/span><\/td>\n<td width=\"60\"><span style=\"color: #000000;\">1<\/span><\/td>\n<\/tr>\n<tr>\n<td width=\"52\"><span style=\"color: #000000;\">5<\/span><\/td>\n<td width=\"328\"><span style=\"color: #000000;\">Wire Rope Sling \u2013 5 (26mm, 7.38m long)<\/span><\/td>\n<td width=\"60\"><span style=\"color: #000000;\">1<\/span><\/td>\n<\/tr>\n<tr>\n<td width=\"52\"><span style=\"color: #000000;\">6<\/span><\/td>\n<td width=\"328\"><span style=\"color: #000000;\">Wire Rope Sling \u2013 6 (26mm, 4.48m long)<\/span><\/td>\n<td width=\"60\"><span style=\"color: #000000;\">1<\/span><\/td>\n<\/tr>\n<tr>\n<td width=\"52\"><span style=\"color: #000000;\">7<\/span><\/td>\n<td width=\"328\"><span style=\"color: #000000;\">Wire Rope Sling \u2013 7 (26mm, 8.27m long)<\/span><\/td>\n<td width=\"60\"><span style=\"color: #000000;\">1<\/span><\/td>\n<\/tr>\n<tr>\n<td width=\"52\"><span style=\"color: #000000;\">8<\/span><\/td>\n<td width=\"328\"><span style=\"color: #000000;\">Shackle Crosby G-2130 (SWL 17 MT)<\/span><\/td>\n<td width=\"60\"><span style=\"color: #000000;\">3<\/span><\/td>\n<\/tr>\n<tr>\n<td width=\"52\"><span style=\"color: #000000;\">9<\/span><\/td>\n<td width=\"328\"><span style=\"color: #000000;\">Master Link \u2018A-342 Alloy\u2019 (SWL 16.43 MT)<\/span><\/td>\n<td width=\"60\"><span style=\"color: #000000;\">3<\/span><\/td>\n<\/tr>\n<tr>\n<td width=\"52\"><span style=\"color: #000000;\">10<\/span><\/td>\n<td width=\"328\"><span style=\"color: #000000;\">Shackle Crosby G-2130 (SWL 8.5 MT)<\/span><\/td>\n<td width=\"60\"><span style=\"color: #000000;\">8<\/span><\/td>\n<\/tr>\n<tr>\n<td width=\"52\"><span style=\"color: #000000;\">11<\/span><\/td>\n<td width=\"328\"><span style=\"color: #000000;\">Round Sling (To double choke around spool, 3m long)<\/span><\/td>\n<td width=\"60\"><span style=\"color: #000000;\">7<\/span><\/td>\n<\/tr>\n<tr>\n<td width=\"52\"><span style=\"color: #000000;\">12<\/span><\/td>\n<td width=\"328\"><span style=\"color: #000000;\">Chain Block \u2018Maxi Lift MC-10\u2019 (1m long)<\/span><\/td>\n<td width=\"60\"><span style=\"color: #000000;\">6<\/span><\/td>\n<\/tr>\n<tr>\n<td colspan=\"4\" width=\"631\"><span style=\"color: #000000;\">Lift Rigging for 10\u201d Production Pipeline Spool No. 3 at TPAM<\/span><\/p>\n<p><span style=\"color: #000000;\">(Refer to 12012-AMC-DUA-ME-DW-2036 10\u201d Production Pipeline Spool No. 3 at TPAM Lift Rigging Arrangement)<\/span><\/td>\n<\/tr>\n<tr>\n<td width=\"52\"><span style=\"color: #000000;\">1<\/span><\/td>\n<td width=\"328\"><span style=\"color: #000000;\">Wire Rope Sling \u2013 1 (26mm dia., 6.56m long)<\/span><\/td>\n<td width=\"60\"><span style=\"color: #000000;\">1<\/span><\/td>\n<td rowspan=\"12\" width=\"192\"><span style=\"color: #000000;\">Pre-rigged to spool by PTSC<\/span><\/p>\n<p><span style=\"color: #000000;\">\u00a0<\/span><\/td>\n<\/tr>\n<tr>\n<td width=\"52\"><span style=\"color: #000000;\">2<\/span><\/td>\n<td width=\"328\"><span style=\"color: #000000;\">Wire Rope Sling \u2013 2 (26mm, 5.50m long)<\/span><\/td>\n<td width=\"60\"><span style=\"color: #000000;\">1<\/span><\/td>\n<\/tr>\n<tr>\n<td width=\"52\"><span style=\"color: #000000;\">3<\/span><\/td>\n<td width=\"328\"><span style=\"color: #000000;\">Wire Rope Sling \u2013 3 (26mm, 9.14m long)<\/span><\/td>\n<td width=\"60\"><span style=\"color: #000000;\">1<\/span><\/td>\n<\/tr>\n<tr>\n<td width=\"52\"><span style=\"color: #000000;\">4<\/span><\/td>\n<td width=\"328\"><span style=\"color: #000000;\">Wire Rope Sling \u2013 4 (26mm, 4.63m long)<\/span><\/td>\n<td width=\"60\"><span style=\"color: #000000;\">1<\/span><\/td>\n<\/tr>\n<tr>\n<td width=\"52\"><span style=\"color: #000000;\">5<\/span><\/td>\n<td width=\"328\"><span style=\"color: #000000;\">Wire Rope Sling \u2013 5 (26mm, 6.72m long)<\/span><\/td>\n<td width=\"60\"><span style=\"color: #000000;\">1<\/span><\/td>\n<\/tr>\n<tr>\n<td width=\"52\"><span style=\"color: #000000;\">6<\/span><\/td>\n<td width=\"328\"><span style=\"color: #000000;\">Wire Rope Sling \u2013 6 (26mm, 5.98m long)<\/span><\/td>\n<td width=\"60\"><span style=\"color: #000000;\">1<\/span><\/td>\n<\/tr>\n<tr>\n<td width=\"52\"><span style=\"color: #000000;\">7<\/span><\/td>\n<td width=\"328\"><span style=\"color: #000000;\">Wire Rope Sling \u2013 7 (26mm, 7.31m long)<\/span><\/td>\n<td width=\"60\"><span style=\"color: #000000;\">1<\/span><\/td>\n<\/tr>\n<tr>\n<td width=\"52\"><span style=\"color: #000000;\">8<\/span><\/td>\n<td width=\"328\"><span style=\"color: #000000;\">Shackle Crosby G-2130 (SWL 17 MT)<\/span><\/td>\n<td width=\"60\"><span style=\"color: #000000;\">3<\/span><\/td>\n<\/tr>\n<tr>\n<td width=\"52\"><span style=\"color: #000000;\">9<\/span><\/td>\n<td width=\"328\"><span style=\"color: #000000;\">Master Link \u2018A-342 Alloy\u2019 (SWL 16.43 MT)<\/span><\/td>\n<td width=\"60\"><span style=\"color: #000000;\">3<\/span><\/td>\n<\/tr>\n<tr>\n<td width=\"52\"><span style=\"color: #000000;\">10<\/span><\/td>\n<td width=\"328\"><span style=\"color: #000000;\">Shackle Crosby G-2130 (SWL 8.5 MT)<\/span><\/td>\n<td width=\"60\"><span style=\"color: #000000;\">8<\/span><\/td>\n<\/tr>\n<tr>\n<td width=\"52\"><span style=\"color: #000000;\">11<\/span><\/td>\n<td width=\"328\"><span style=\"color: #000000;\">Round Sling (To double choke around spool, 3m long)<\/span><\/td>\n<td width=\"60\"><span style=\"color: #000000;\">7<\/span><\/td>\n<\/tr>\n<tr>\n<td width=\"52\"><span style=\"color: #000000;\">12<\/span><\/td>\n<td width=\"328\"><span style=\"color: #000000;\">Chain Block \u2018Maxi Lift MC-10\u2019 (1m long)<\/span><\/td>\n<td width=\"60\"><span style=\"color: #000000;\">6<\/span><\/td>\n<\/tr>\n<tr>\n<td colspan=\"4\" width=\"631\"><span style=\"color: #000000;\">Lift Rigging for 10\u201d Pigging\/Gas Lift Spool No. 4 at TPAM<\/span><\/p>\n<p><span style=\"color: #000000;\">(Refer to 12012-AMC-DUA-ME-DW-2037 10\u201d Pigging\/Gas Lift Spool No. 4 at TPAM Lift Rigging Arrangement)<\/span><\/td>\n<\/tr>\n<tr>\n<td width=\"52\"><span style=\"color: #000000;\">1<\/span><\/td>\n<td width=\"328\"><span style=\"color: #000000;\">Wire Rope Sling \u2013 1 (26mm dia., 6.60m long)<\/span><\/td>\n<td width=\"60\"><span style=\"color: #000000;\">1<\/span><\/td>\n<td rowspan=\"11\" width=\"192\">&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p><span style=\"color: #000000;\">Pre-rigged to spool by PTSC<\/span><\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p><span style=\"color: #000000;\">\u00a0<\/span><\/td>\n<\/tr>\n<tr>\n<td width=\"52\"><span style=\"color: #000000;\">2<\/span><\/td>\n<td width=\"328\"><span style=\"color: #000000;\">Wire Rope Sling \u2013 2 (26mm, 5.59m long)<\/span><\/td>\n<td width=\"60\"><span style=\"color: #000000;\">1<\/span><\/td>\n<\/tr>\n<tr>\n<td width=\"52\"><span style=\"color: #000000;\">3<\/span><\/td>\n<td width=\"328\"><span style=\"color: #000000;\">Wire Rope Sling \u2013 3 (26mm, 6.77m long)<\/span><\/td>\n<td width=\"60\"><span style=\"color: #000000;\">1<\/span><\/td>\n<\/tr>\n<tr>\n<td width=\"52\"><span style=\"color: #000000;\">4<\/span><\/td>\n<td width=\"328\"><span style=\"color: #000000;\">Wire Rope Sling \u2013 4 (26mm, 8.32m long)<\/span><\/td>\n<td width=\"60\"><span style=\"color: #000000;\">1<\/span><\/td>\n<\/tr>\n<tr>\n<td width=\"52\"><span style=\"color: #000000;\">5<\/span><\/td>\n<td width=\"328\"><span style=\"color: #000000;\">Wire Rope Sling \u2013 5 (26mm, 6.05m long)<\/span><\/td>\n<td width=\"60\"><span style=\"color: #000000;\">1<\/span><\/td>\n<\/tr>\n<tr>\n<td width=\"52\"><span style=\"color: #000000;\">6<\/span><\/td>\n<td width=\"328\"><span style=\"color: #000000;\">Wire Rope Sling \u2013 6 (26mm, 5.20m long)<\/span><\/td>\n<td width=\"60\"><span style=\"color: #000000;\">1<\/span><\/td>\n<\/tr>\n<tr>\n<td width=\"52\"><span style=\"color: #000000;\">8<\/span><\/td>\n<td width=\"328\"><span style=\"color: #000000;\">Shackle Crosby G-2130 (SWL 17 MT)<\/span><\/td>\n<td width=\"60\"><span style=\"color: #000000;\">3<\/span><\/td>\n<\/tr>\n<tr>\n<td width=\"52\"><span style=\"color: #000000;\">9<\/span><\/td>\n<td width=\"328\"><span style=\"color: #000000;\">Master Link \u2018A-342 Alloy\u2019 (SWL 16.43 MT)<\/span><\/td>\n<td width=\"60\"><span style=\"color: #000000;\">3<\/span><\/td>\n<\/tr>\n<tr>\n<td width=\"52\"><span style=\"color: #000000;\">10<\/span><\/td>\n<td width=\"328\"><span style=\"color: #000000;\">Shackle Crosby G-2130 (SWL 8.5 MT)<\/span><\/td>\n<td width=\"60\"><span style=\"color: #000000;\">7<\/span><\/td>\n<\/tr>\n<tr>\n<td width=\"52\"><span style=\"color: #000000;\">11<\/span><\/td>\n<td width=\"328\"><span style=\"color: #000000;\">Round Sling (To double choke around spool, 3m long)<\/span><\/td>\n<td width=\"60\"><span style=\"color: #000000;\">6<\/span><\/td>\n<\/tr>\n<tr>\n<td width=\"52\"><span style=\"color: #000000;\">12<\/span><\/td>\n<td width=\"328\"><span style=\"color: #000000;\">Chain Block \u2018Maxi Lift MC-10\u2019 (1m long)<\/span><\/td>\n<td width=\"60\"><span style=\"color: #000000;\">5<\/span><\/td>\n<\/tr>\n<tr>\n<td colspan=\"4\" width=\"631\"><span style=\"color: #000000;\">Lifting Rigging for A-frame<\/span><\/p>\n<p><span style=\"color: #000000;\">(Refer to 12012-AMC-DUA-ME-DW-#### \u00a0A-Frame Lifting Rigging Arrangement)<\/span><\/td>\n<\/tr>\n<tr>\n<td width=\"52\"><span style=\"color: #000000;\">1<\/span><\/td>\n<td width=\"328\"><span style=\"color: #000000;\">TBC<\/span><\/td>\n<td width=\"60\"><span style=\"color: #000000;\">&#8211;<\/span><\/td>\n<td width=\"192\"><span style=\"color: #000000;\">\u00a0<\/span><\/td>\n<\/tr>\n<tr>\n<td colspan=\"4\" width=\"631\"><span style=\"color: #000000;\">Crane Main Block Stinger<\/span><\/p>\n<p><span style=\"color: #000000;\">(Refer to FSTM-TP-DRN-00005 Crane Main Block Standard Rigging)<\/span><\/td>\n<\/tr>\n<tr>\n<td width=\"52\"><span style=\"color: #000000;\">1<\/span><\/td>\n<td width=\"328\"><span style=\"color: #000000;\">Gunnebo M-3226-10 Master Link 43MT SWL<\/span><\/td>\n<td width=\"60\"><span style=\"color: #000000;\">2<\/span><\/td>\n<td width=\"192\"><span style=\"color: #000000;\">\u00a0<\/span><\/td>\n<\/tr>\n<tr>\n<td width=\"52\"><span style=\"color: #000000;\">2<\/span><\/td>\n<td width=\"328\"><span style=\"color: #000000;\">Green Pin Bolt Type Safety Anchor Shackle 85MT SWL<\/span><\/td>\n<td width=\"60\"><span style=\"color: #000000;\">1<\/span><\/td>\n<td width=\"192\"><span style=\"color: #000000;\">\u00a0<\/span><\/td>\n<\/tr>\n<tr>\n<td colspan=\"4\" width=\"631\"><span style=\"color: #000000;\">Crane Aux Block Stinger<\/span><\/td>\n<\/tr>\n<tr>\n<td width=\"52\"><span style=\"color: #000000;\">1<\/span><\/td>\n<td width=\"328\"><span style=\"color: #000000;\">TBC<\/span><\/td>\n<td width=\"60\"><span style=\"color: #000000;\">&#8211;<\/span><\/td>\n<td width=\"192\"><span style=\"color: #000000;\">\u00a0<\/span><\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p><span style=\"color: #000000;\"><u><strong>WEATHER CRITERIA<\/strong><\/u><\/span><\/p>\n<p><span style=\"color: #000000;\">A general guideline for the installation environment is shown in Table 7.1.1 below \/45.\/.<\/span><\/p>\n<table style=\"height: 360px;\" width=\"805\">\n<tbody>\n<tr>\n<td colspan=\"7\" width=\"660\"><span style=\"color: #000000;\">10in Tie-in Spool Installation<\/span><\/td>\n<\/tr>\n<tr>\n<td width=\"94\"><span style=\"color: #000000;\">Hs\/Heading<\/span><\/td>\n<td width=\"94\"><span style=\"color: #000000;\">0<\/span><\/td>\n<td width=\"94\"><span style=\"color: #000000;\">15<\/span><\/td>\n<td width=\"94\"><span style=\"color: #000000;\">165<\/span><\/td>\n<td width=\"94\"><span style=\"color: #000000;\">180<\/span><\/td>\n<td width=\"94\"><span style=\"color: #000000;\">195<\/span><\/td>\n<td width=\"94\"><span style=\"color: #000000;\">345<\/span><\/td>\n<\/tr>\n<tr>\n<td width=\"94\"><span style=\"color: #000000;\">&lt;1.5<\/span><\/td>\n<td width=\"94\"><span style=\"color: #000000;\">\u00a0<\/span><\/td>\n<td width=\"94\"><span style=\"color: #000000;\">\u00a0<\/span><\/td>\n<td width=\"94\"><span style=\"color: #000000;\">\u00a0<\/span><\/td>\n<td width=\"94\"><span style=\"color: #000000;\">\u00a0<\/span><\/td>\n<td width=\"94\"><span style=\"color: #000000;\">\u00a0<\/span><\/td>\n<td width=\"94\"><span style=\"color: #000000;\">\u00a0<\/span><\/td>\n<\/tr>\n<tr>\n<td width=\"94\"><span style=\"color: #000000;\">1.5 to 2.0<\/span><\/td>\n<td width=\"94\"><span style=\"color: #000000;\">\u00a0<\/span><\/td>\n<td width=\"94\"><span style=\"color: #000000;\">\u00a0<\/span><\/td>\n<td width=\"94\"><span style=\"color: #000000;\">\u00a0<\/span><\/td>\n<td width=\"94\"><span style=\"color: #000000;\">\u00a0<\/span><\/td>\n<td width=\"94\"><span style=\"color: #000000;\">\u00a0<\/span><\/td>\n<td width=\"94\"><span style=\"color: #000000;\">\u00a0<\/span><\/td>\n<\/tr>\n<tr>\n<td width=\"94\"><span style=\"color: #000000;\">2.0 to 2.5<\/span><\/td>\n<td width=\"94\"><span style=\"color: #000000;\">\u00a0<\/span><\/td>\n<td width=\"94\"><span style=\"color: #000000;\">\u00a0<\/span><\/td>\n<td width=\"94\"><span style=\"color: #000000;\">\u00a0<\/span><\/td>\n<td width=\"94\"><span style=\"color: #000000;\">\u00a0<\/span><\/td>\n<td width=\"94\"><span style=\"color: #000000;\">\u00a0<\/span><\/td>\n<td width=\"94\"><span style=\"color: #000000;\">\u00a0<\/span><\/td>\n<\/tr>\n<tr>\n<td width=\"94\"><span style=\"color: #000000;\">&gt;2.5<\/span><\/td>\n<td width=\"94\"><span style=\"color: #000000;\">\u00a0<\/span><\/td>\n<td width=\"94\"><span style=\"color: #000000;\">\u00a0<\/span><\/td>\n<td width=\"94\"><span style=\"color: #000000;\">\u00a0<\/span><\/td>\n<td width=\"94\"><span style=\"color: #000000;\">\u00a0<\/span><\/td>\n<td width=\"94\"><span style=\"color: #000000;\">\u00a0<\/span><\/td>\n<td width=\"94\"><span style=\"color: #000000;\">\u00a0<\/span><\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>&nbsp;<\/p>\n<table>\n<tbody>\n<tr>\n<td width=\"92\"><span style=\"color: #000000;\">\u00a0<\/span><\/td>\n<td width=\"567\"><span style=\"color: #000000;\">Installation can continue<\/span><\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>&nbsp;<\/p>\n<table>\n<tbody>\n<tr>\n<td width=\"92\"><span style=\"color: #000000;\">\u00a0<\/span><\/td>\n<td width=\"567\"><span style=\"color: #000000;\">Installation can continue after discussion and agreement between OCM (offshore construction manager) and CSR (client\u2019s representative)<\/span><\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>&nbsp;<\/p>\n<table>\n<tbody>\n<tr>\n<td width=\"92\"><span style=\"color: #000000;\">\u00a0<\/span><\/td>\n<td width=\"567\"><span style=\"color: #000000;\">Operation must not start<\/span><\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>&nbsp;<\/p>\n<p><span style=\"color: #000000;\">The wave heading orientations are in reference to the diagram below:<\/span><\/p>\n<p><span style=\"color: #000000;\">Figure 7.1: Orientation of wave headings with respect to Toisa Paladin<\/span><\/p>\n<p><span style=\"color: #000000;\">For the wave height criteria shown above, the corresponding heave motions can be referred to in Ref. \/28.\/ and \/45.\/. For the wave height not stated, linear interpolation can be applied to obtain the corresponding heave motion. It is noted that the Hs reported above is indicative.<\/span><\/p>\n<p><span style=\"color: #000000;\"><u><strong>SPOOL INSTALLATION<\/strong><\/u><\/span><\/p>\n<p><span style=\"color: #000000;\"><strong>Spool #1 &amp; Spool #2 Installation at PLEM3 Location<\/strong><\/span><\/p>\n<p><span style=\"color: #000000;\"><u>Task Summary<\/u><\/span><\/p>\n<p><span style=\"color: #000000;\">Carry out the following activities:<\/span><\/p>\n<ul>\n<li><span style=\"color: #000000;\">Alongside spool barge<\/span><\/li>\n<li><span style=\"color: #000000;\">Lift spool from cargo barge<\/span><\/li>\n<li><span style=\"color: #000000;\">Lower spools into water<\/span><\/li>\n<li><span style=\"color: #000000;\">Remove 2 blind flanges @ PLEM 3 and 2 blind flanges @ pipelines<\/span><\/li>\n<li><span style=\"color: #000000;\">Insert chemical bundle and tie-in spool @ PLEM 3 &amp; Pipelines (Production &amp; Pigging\/Gas Lift)<\/span><\/li>\n<\/ul>\n<p><span style=\"color: #000000;\"><u>Operational<\/u><u> limitations<\/u><\/span><\/p>\n<p><span style=\"color: #000000;\">H<sub>s<\/sub> is equal or less than 2.0m<\/span><\/p>\n<p><span style=\"color: #000000;\">Maximum window for installation is 24 Hours<\/span><\/p>\n<p><span style=\"color: #000000;\"><u>Status<\/u><\/span><\/p>\n<ul>\n<li><span style=\"color: #000000;\">Project brief completed.<\/span><\/li>\n<li><span style=\"color: #000000;\">Toolbox talk has been conducted with all personnel involved in the operation.<\/span><\/li>\n<li><span style=\"color: #000000;\">Completed general deck preparations for lift, i.e. function check on equipment, diver\u2019s work basket material check, mooring rope in standby position, yokohama buoys have been installed and etc.<\/span><\/li>\n<li><span style=\"color: #000000;\">Perform communication check prior to operation commencing including but not limited to: FPSO, bridge, shift supervisor, deck foreman \/ barge foreman, crane operator.<\/span><\/li>\n<li><span style=\"color: #000000;\">All survey data is displayed on vessel navigation screen.<\/span><\/li>\n<li><span style=\"color: #000000;\">FPSO is on heading control.<\/span><\/li>\n<li><span style=\"color: #000000;\">Toisa Paladin has been set up on location as planned.<\/span><\/li>\n<li><span style=\"color: #000000;\">PTW in place.<\/span><\/li>\n<li><span style=\"color: #000000;\">Weather Forecast has been assessed for installation window.<\/span><\/li>\n<li><span style=\"color: #000000;\">Pipeline is flooded.<\/span><\/li>\n<li><span style=\"color: #000000;\">Inform FPSO entering 500m zone in advance.<\/span><\/li>\n<li><span style=\"color: #000000;\">Over boarding chute has been removed<\/span><\/li>\n<li><span style=\"color: #000000;\">Crane has been set in AHC mode<\/span><\/li>\n<\/ul>\n<p><span style=\"color: #000000;\"><u>Pre-Installation Works &amp; Spool Deployment<\/u><\/span><\/p>\n<ul>\n<li><span style=\"color: #000000;\">Once DSV is outside of 500m zone, master to inform material barge tow tug that DSV will along side the material barge. Ocean Union tug (tow tug) to maintain material barge position and heading<\/span><br \/>\n<span style=\"color: #000000;\"> DSV to move in DP and alongside material barge on the STBD side in bow to stern configuration and secure material barge.\u00a0<strong>Refer to drawing no: 12012-AMC-DUA-ME-DW-2044-01.\u00a0<\/strong>Refer to \/47.\/ for cargo barge mooring procedure.<\/span><\/li>\n<li><span style=\"color: #000000;\">Transfer riggers, field engineers, MWS, fitters and surveyors to material barge. Refer to \/48.\/ for Personnel Transfer Procedure.\u00a0<strong>SAFETY NOTE:<\/strong> Work vest to be worn for personnel transfer<\/span><\/li>\n<li><span style=\"color: #000000;\">Inspect spool for the following:1) Spool lift rigging \u2013 <strong>Refer drawing no. 12012-AMC-DUA-ME-DW-2034<\/strong>2) Spool Seafastening \u2013 <strong>Refer drawing no. 12012-AMC-DUA-ME-DW-1910<\/strong>3) Check spool condition for any damagesWhile inspecting, deploy ROV to conduct seabed survey between PLEM 3 and pipelines.<\/span><\/li>\n<li><span style=\"color: #000000;\">Surveyor to install beacons at the back of flanges and switch on the beacon.<\/span><\/li>\n<li><span style=\"color: #000000;\">Remove deck seafastening of spool. Riggers to install running tag lines on the spool as necessary and remove the rope protector.<\/span><\/li>\n<li><span style=\"color: #000000;\">Position the crane block above spreader bar and connect the spreader bar lift rigging to crane block.<\/span><\/li>\n<li><span style=\"color: #000000;\">Pick up spreader bar and connect the spreader bar to the pre-rigged slings at the spool.<strong>Refer to drawing nos.:<\/strong><strong>12012-AMC-DUA-ME-DW-2034<\/strong><strong>12012-AMC-DUA-ME-DW-2046<\/strong><\/span><\/li>\n<li><span style=\"color: #000000;\">Position crane block above spool COG and apply tension to the sling.<\/span><\/li>\n<li><span style=\"color: #000000;\">Pick-up the spool slowly until the spool is clear of the seafastening. Spool orientation as per final orientation will be done by ROV or diver.\u00a0<strong>SAFETY NOTE:<\/strong> Spool may swing. Riggers will have to keep the running tags lines tight. Running tag line can be wrapped around DSV bulwark to prevent movement.<\/span><\/li>\n<li><span style=\"color: #000000;\">Unmoor the material barge and cast off the barge.\u00a0<strong>Refer to drawing no. 12012-AMC-DUA-ME-DW-2044-02.\u00a0<\/strong><strong>Note: <\/strong>Personnel on material barge will be transferred back to DSV at later stage<\/span><\/li>\n<li><span style=\"color: #000000;\">Launch ROV to monitor the lowering of the spool.<\/span><br \/>\n<span style=\"color: #000000;\"> Pay out the crane wire slowly until the splash zone and free flood the spool. Once the spool is lowered under water, running tag lines will be released. Continue to lower spool until 10m above the seabed.<\/span><\/li>\n<li><span style=\"color: #000000;\">DSV to request permission from FPSO before entering 500m zone.<\/span><\/li>\n<li><span style=\"color: #000000;\">After permission has been granted, start set-up. Move DSV to set-up location with the spool hanging at STBD side of DSV while ROV to monitor the spool.<strong>Refer to drawing no.: <\/strong><strong>12012-AMC-DUA-ME-DW-2044-03\u00a0<\/strong><strong>12012-AMC-DUA-ME-DW-2044-04<\/strong><\/span><\/li>\n<\/ul>\n<p><span style=\"color: #000000;\"><u>Production Pipeline Tie-In @ PLEM End<\/u><\/span><\/p>\n<ul>\n<li><span style=\"color: #000000;\">Launch SAT divers and deploy diver\u2019s work basket.<\/span><\/li>\n<li><span style=\"color: #000000;\">Diver to swim to PLEM 3.<\/span><\/li>\n<li><span style=\"color: #000000;\">Diver to open the diffuser installed at the blind flange @ PLEM 3 flange to check for pressure in the subsea structure. Diver to remove the blind flange by nut splitter (size TBC).<\/span><\/li>\n<li><span style=\"color: #000000;\">Diver to instruct the crane to bring the spool nearer to flange face until the alignment of bolt holes of the PLEM 3 and tie-in spool flange are in good position for bolt insertion.<\/span><\/li>\n<li><span style=\"color: #000000;\">Diver to install the flange pulling device (3 MT) comealong at 3 &amp; 9 o\u2019clock bolt holes and reaction force jig at PLEM 3 flange.<\/span><\/li>\n<li><span style=\"color: #000000;\">Bring the spool flange face close to PLEM 3 using the combination of crane movement and flange pull-in device, as well as the chain block installed on to spool, to adjust the elevation.<\/span><\/li>\n<li><span style=\"color: #000000;\">Diver to place and align the bolt holes by using drift pins, then to insert bolts to any of the lower flange holes, where available. Bolts insertion for lower half of the flange will continue until flange connection is loosely secured.<\/span><\/li>\n<li><span style=\"color: #000000;\">When the lower half of bolts and nuts are loosely secured, diver to remove drift pins.<\/span><\/li>\n<li><span style=\"color: #000000;\">Using fishing rope, diver to insert the gasket into the flange groove. Diver to also insert chemical bundle (Quantity: TBC).\u00a0<strong>Refer to Appendix C for MSDS.<\/strong><\/span><\/li>\n<li><span style=\"color: #000000;\">Diver to continue to insert upper half bolts and hand tighten up all the nuts. Meanwhile, carefully check to ensure the ring gasket is in proper position.<\/span><\/li>\n<li><span style=\"color: #000000;\">When all of the bolts &amp; nuts are installed and hand tightened in position, diver to proceed to hydraulic bolt tensioning operation.\u00a0<strong>Refer Appendix E for bolt tensioning procedure\/data sheet.<\/strong><\/span><\/li>\n<li><span style=\"color: #000000;\">Diver to disconnect spool lift rigging at spool except wire sling no.3, no.4 &amp; no.5 which are to be used to tie in the spool and the pipeline side at later stage.\u00a0<strong>Refer to drawing no. 12012-AMC-DUA-ME-DW-2043-01<\/strong><\/span><\/li>\n<li><span style=\"color: #000000;\">Recover crane to deck with the spreader bar.<\/span><\/li>\n<\/ul>\n<p><span style=\"color: #000000;\"><u>Production Pipeline Tie-In @ Pipeline End<\/u><\/span><\/p>\n<ul>\n<li><span style=\"color: #000000;\">Diver to come back to bell and DSV to reposition closer to 10\u2019\u2019 production pipeline end.<\/span><\/li>\n<li><span style=\"color: #000000;\">\u00a0Diver to swim to production pipeline end and install the handling rigging (Size: TBC) at approx. 10m from flange face at pipelines side. On the deck of DSV, riggers to rig up 1 x 10T diver\u2019s A-frame c\/w 5T x 3.5 m chain block and 2 taglines opposite from each other. The weight of the A-frame is approx. 1.0 MT each<\/span><\/li>\n<li><span style=\"color: #000000;\">Crane to pick up the A-frame by crane and slew to STBD side. Lower the frame into the water slowly.<\/span><\/li>\n<li><span style=\"color: #000000;\">Diver to move in and guide the frame to location when it is approx. 3 m from seabed over the production pipeline.\u00a0<strong>Note:<\/strong> Attention to be paid to umbilical management whilst guiding \/ lowering A-frame by diver. Diver to confirm A-frame is in position, stable and horizontal by eye sight. Crane to slack and diver to release the crane hook. Deck to recover crane hook.<\/span><\/li>\n<li><span style=\"color: #000000;\">Diver to connect the chain block to the handling rigging.<\/span><\/li>\n<li><span style=\"color: #000000;\">Diver to pull-in the chain block to lift up the production pipeline from seabed.<\/span><\/li>\n<li><span style=\"color: #000000;\">Diver to release the residual hydro test pressure inside the pipeline through the diffuser installed at the blind flange. After the pressure has been released, diver to remove the blind flange by nut splitter (Size: TBC).<\/span><\/li>\n<li><span style=\"color: #000000;\">Diver to connect crane to the spool with the crane stinger.\u00a0<strong>Refer to drawing no. 12012-AMC-DUA-ME-DW-2043-01<\/strong><\/span><\/li>\n<li><span style=\"color: #000000;\">Diver to instruct the crane to bring the spool nearer to flange face until the alignment of bolt holes of the tie-in spool flange and pipeline flange are in good position for bolt insertion. Pre-installed air bags may be used to facilitate the alignment.<\/span><\/li>\n<li><span style=\"color: #000000;\">Diver to install the flange pulling device (3 MT) comealong at 3 &amp; 9 o\u2019clock bolt hole and reaction force jig at pipeline flange.<\/span><\/li>\n<li><span style=\"color: #000000;\">Bring the spool flange face close to pipeline using the combination of crane movement and flange pull-in device, as well as A-Frame installed to pipeline to adjust the elevation.<\/span><\/li>\n<li><span style=\"color: #000000;\">Diver to place and align the bolt holes by drift pins, then insert bolts to any lower flange holes, where available. Bolts insertion for lower half of the flange will continue until flange connection is loosely secured.<\/span><\/li>\n<li><span style=\"color: #000000;\">When lower half of bolts and nuts are loosed secured, diver to remove drift pin.<\/span><\/li>\n<li><span style=\"color: #000000;\">Using fishing rope, diver to insert the gasket into the flange groove. Diver also to insert chemical bundle. (Quantity: TBC).\u00a0<strong>Refer to Appendix C for MSDS.<\/strong><\/span><\/li>\n<li><span style=\"color: #000000;\">Diver to continue to insert upper half bolts and hand tighten up all the nuts. Meanwhile, carefully check to ensure the ring gasket is in proper position.<\/span><\/li>\n<li><span style=\"color: #000000;\">When all of the bolts &amp; nuts are installed and hand tightened in position, diver to proceed to hydraulic bolt tensioning operation.\u00a0<strong>Refer Appendix E for bolt tensioning procedure\/data sheet.<\/strong><\/span><\/li>\n<li><span style=\"color: #000000;\">De-rig the lift rigging from the spool and recover the rigging to the deck.<\/span><\/li>\n<li><span style=\"color: #000000;\">Remove the beacon on the spool and recover the diver to diving bell. Ensure there is no obstruction\/ debris at production pipeline tie-in spool location.<\/span><\/li>\n<\/ul>\n<p><span style=\"color: #000000;\"><u>Pigging\/Gas Lift Pipeline Tie-In \u00a0Installation @ PLEM 3 Location<\/u><\/span><\/p>\n<ul>\n<li><span style=\"color: #000000;\">Upon completion of 10\u2019\u2019 production tie-in spool, DSV to move out of the 500M zone to receive the spool barge in bow to stern configuration and secured.\u00a0<strong>Refer to drawing nos.:\u00a0<\/strong><strong>12012-AMC-DUA-ME-DW-2044-01<\/strong><\/span><\/li>\n<li><span style=\"color: #000000;\">Repeat steps 2 to 12 in sub-task #1.1 &amp; all steps in sub-task #1.2 for 10\u2019\u2019 pigging\/gas lift tie-in @ PLEM end.\u00a0<strong>Refer to drawings nos.:\u00a0<\/strong><strong>12012-AMC-DUA-ME-DW-2044-02;\u00a0<\/strong><strong>12012-AMC-DUA-ME-DW-2044-03;\u00a0<\/strong><strong>12012-AMC-DUA-ME-DW-2044-04;\u00a0<\/strong><strong>12012-AMC-DUA-ME-DW-2035;\u00a0<\/strong><strong>12012-AMC-DUA-ME-DW-2047<\/strong><\/span><\/li>\n<li><span style=\"color: #000000;\">Repeat all the steps in sub-task #1.3 for 10\u2019\u2019 pigging\/gas lift tie-in @ Pipeline end.\u00a0<strong>Refer to drawings nos.:\u00a0<\/strong><strong>12012-AMC-DUA-ME-DW-2043-02<\/strong><\/span><\/li>\n<li><span style=\"color: #000000;\">Launch ROV to perform as-built and debris survey on both tie-in spools @ PLEM 3<\/span><\/li>\n<li><span style=\"color: #000000;\">Take fixes at following spots for surveyor to draw the as-built of the spools:<\/span><br \/>\n<span style=\"color: #000000;\"> a) Flange connections<\/span><br \/>\n<span style=\"color: #000000;\"> b)\u00a0\u00a0\u00a0 Start of bend<\/span><br \/>\n<span style=\"color: #000000;\"> c)\u00a0\u00a0\u00a0\u00a0 End of bend<\/span><\/li>\n<li><span style=\"color: #000000;\">Recover the ROV once surveyor does not require additional data.<\/span><\/li>\n<li><span style=\"color: #000000;\">Upon completion, DSV to move to TPAM location.<\/span><\/li>\n<\/ul>\n<p><span style=\"color: #000000;\"><strong>Spool #3 &amp; Spool #4 Installation at TPAM Location<\/strong><\/span><\/p>\n<p><span style=\"color: #000000;\"><u>Task Summary<\/u><\/span><\/p>\n<p><span style=\"color: #000000;\">Carry out the following activities:<\/span><\/p>\n<ul>\n<li><span style=\"color: #000000;\">Alongside spool barge<\/span><\/li>\n<li><span style=\"color: #000000;\">Lift spool from cargo barge<\/span><\/li>\n<li><span style=\"color: #000000;\">Lower spools into water<\/span><\/li>\n<li><span style=\"color: #000000;\">Remove 2 blind flanges @ TPAM and 2 blind flanges @ pipelines<\/span><\/li>\n<li><span style=\"color: #000000;\">Insert chemical bundle and tie-in spool @ TPAM &amp; Pipeline (Production &amp; Pigging\/Gas Lift)<\/span><\/li>\n<\/ul>\n<p><span style=\"color: #000000;\"><u>Status<\/u><\/span><\/p>\n<ul>\n<li><span style=\"color: #000000;\">Project brief completed.<\/span><\/li>\n<li><span style=\"color: #000000;\">Toolbox talk has been conducted with all personnel involved in the operation.<\/span><\/li>\n<li><span style=\"color: #000000;\">Completed general deck preparations for lift, i.e. function check on equipment, diver\u2019s work basket material check, mooring rope in standby position, yokohama buoys have been installed and etc.<\/span><\/li>\n<li><span style=\"color: #000000;\">Perform communication check prior to operation commencing including but not limited to: bridge, shift supervisor, deck foreman \/ barge foreman, crane operator.<\/span><\/li>\n<li><span style=\"color: #000000;\">All survey data is displayed on vessel navigation screen.<\/span><\/li>\n<li><span style=\"color: #000000;\">Toisa Paladin has been set up on location as planned.<\/span><\/li>\n<li><span style=\"color: #000000;\">PTW in place.<\/span><\/li>\n<li><span style=\"color: #000000;\">Weather Forecast has been assessed for installation window.<\/span><\/li>\n<li><span style=\"color: #000000;\">Pipeline is flooded.<\/span><\/li>\n<li><span style=\"color: #000000;\">Over boarding chute has been removed<\/span><\/li>\n<li><span style=\"color: #000000;\">Crane has been set in AHC mode<\/span><\/li>\n<\/ul>\n<p><span style=\"color: #000000;\"><u>Pre-Installation Works &amp; Spool Deployment<\/u><\/span><\/p>\n<ul>\n<li><span style=\"color: #000000;\">Set-up DSV and master to inform material barge tow tug that DSV will along side the material barge. Ocean Union tug (tow tug) to maintain material barge position and heading. DSV to move in DP and alongside material barge on the STBD side in bow to stern configuration and secure material barge.\u00a0<strong>Refer to drawing no: 12012-AMC-DUA-ME-DW-2045-01.\u00a0<\/strong>Refer to \/47.\/ for cargo barge mooring procedure.<\/span><\/li>\n<li><span style=\"color: #000000;\">Transfer riggers, field engineers, MWS, fitters and surveyors to material barge. Refer to \/48.\/ for Personnel Transfer Procedure.\u00a0<strong>SAFETY NOTE:<\/strong> Work vest to be worn for personnel transfer.<\/span><\/li>\n<li><span style=\"color: #000000;\">Inspect spool for the following:<\/span><br \/>\n<span style=\"color: #000000;\"> 1) Spool lift rigging \u2013 <strong>Refer drawing no. 12012-AMC-DUA-ME-DW-2036<\/strong>2) Spool Sea fastening- <strong>Refer drawing no. 12012-AMC-DUA-ME-DW-1910<\/strong>3) Spool condition; any damagesWhile inspecting, deploy ROV to conduct seabed survey between the TPAM and pipelines.<\/span><\/li>\n<li><span style=\"color: #000000;\">Surveyor to install beacons at the back of flanges and switch on the beacon.<\/span><\/li>\n<li><span style=\"color: #000000;\">Remove deck seafastening at spool. Riggers to install running tag lines on the spool, as necessary, and remove the rope protector.<\/span><\/li>\n<li><span style=\"color: #000000;\">Position the crane block above spreader bar and connect the spreader bar lift rigging to crane block.<\/span><\/li>\n<li><span style=\"color: #000000;\">Pick up spreader bar and connect the spreader bar to the pre-rigged slings at the spool.<strong>Refer to drawing nos.:<\/strong><strong>12012-AMC-DUA-ME-DW-2036<\/strong><strong>12012-AMC-DUA-ME-DW-2048<\/strong><\/span><\/li>\n<li><span style=\"color: #000000;\">Position crane block above spool COG and apply tension to the sling.<\/span><\/li>\n<li><span style=\"color: #000000;\">Pick-up the spool slowly until the spool is clear of the seafastening. Spool orientation as per final orientation will be done by ROV or diver.\u00a0<strong>SAFETY NOTE:<\/strong> Spool may swing. Riggers will have to keep the running tags lines tight. Running tag line can be wrapped around DSV bulwark to prevent movement.<\/span><\/li>\n<li><span style=\"color: #000000;\">Unmoor the material barge and cast off the barge.\u00a0<strong>Refer to drawing no. 12012-AMC-DUA-ME-DW-2045-02.\u00a0<\/strong><strong>Note: <\/strong>Personnel on material barge will be transferred back to DSV at later stage<\/span><\/li>\n<li><span style=\"color: #000000;\">Launch ROV to monitor the lowering of the spool.Pay out the crane wire slowly until the splash zone and free flood the spool. Once the spool is lowered under water, running tag lines will be released. Continue to lower spool until 10m above the seabed.<\/span><\/li>\n<li><span style=\"color: #000000;\">Move DSV to set-up location with the spool hanging at STBD side of DSV while ROV to monitor the spool.<strong>Refer to drawing no.:<\/strong><\/span><span style=\"color: #000000;\"><strong>12012-AMC-DUA-ME-DW-2045-03<\/strong><\/span>\n<p><span style=\"color: #000000;\"><strong>12012-AMC-DUA-ME-DW-2045-04<\/strong><\/span><\/li>\n<\/ul>\n<p><span style=\"color: #000000;\"><u>Production Pipeline Tie-In @ TPAM End<\/u><\/span><\/p>\n<ul>\n<li><span style=\"color: #000000;\">Launch SAT divers and deploy diver\u2019s work basket.<\/span><\/li>\n<li><span style=\"color: #000000;\">Diver to swim to TPAM.<\/span><\/li>\n<li><span style=\"color: #000000;\">Diver to open the diffuser installed at TPAM blind flange to check for pressure in subsea structure. Diver to remove the blind flange by nut splitter (size TBC).<\/span><\/li>\n<li><span style=\"color: #000000;\">Diver to instruct the crane to bring the spool nearer to flange face until the alignment of bolt holes of the TPAM and tie-in spool flange are in good position for bolt insertion.<\/span><\/li>\n<li><span style=\"color: #000000;\">Diver to install the flange pulling device (3 MT) comealong at 3 &amp; 9 o\u2019clock bolt holes and reaction force jig at TPAM flange.<\/span><\/li>\n<li><span style=\"color: #000000;\">Bring the spool flange face close to TPAM using the combination of crane movement and flange pull-in device, as well as the chain block installed on to spool, to adjust the elevation.<\/span><\/li>\n<li><span style=\"color: #000000;\">Diver to place and align the bolt holes by using drift pins, then to insert bolts to any of the lower flange holes, where available. Bolts insertion for lower half of the flange will continue until flange connection is loosely secured.<\/span><\/li>\n<li><span style=\"color: #000000;\">When the lower half of bolts and nuts are loosely secured, diver to remove drift pins.<\/span><\/li>\n<li><span style=\"color: #000000;\">Using fishing rope, diver to insert the gasket into the flange groove. Diver to also insert chemical bundle (Quantity: TBC).\u00a0<strong>Refer to Appendix C for MSDS.<\/strong><\/span><\/li>\n<li><span style=\"color: #000000;\">Diver to continue to insert upper half bolts and hand tighten up all the nuts. Meanwhile, carefully check to ensure the ring gasket is in proper position.<\/span><\/li>\n<li><span style=\"color: #000000;\">When all of the bolts &amp; nuts are installed and hand tightened in position, diver to proceed to hydraulic bolt tensioning operation.\u00a0<strong><strong>Refer Appendix E for bolt tensioning procedure\/data sheet.<\/strong><\/strong><\/span><\/li>\n<li><span style=\"color: #000000;\">Diver to disconnect spool lift rigging at spool except wire sling no.5, no.6 &amp; no.7 which are to be used to tie in the spool and the pipeline side at later stage.\u00a0<strong>Refer to drawing no. 12012-AMC-DUA-ME-DW-<\/strong><strong>2050-01<\/strong><\/span><\/li>\n<li><span style=\"color: #000000;\">Recover crane to deck with the spreader bar.<\/span><\/li>\n<\/ul>\n<p><span style=\"color: #000000;\"><u>Production Pipeline Tie-In @ Pipeline End<\/u><\/span><\/p>\n<ul>\n<li><span style=\"color: #000000;\">Diver to come back to bell and reposition DSV closer to 10\u2019\u2019 production pipeline end.<\/span><\/li>\n<li><span style=\"color: #000000;\">Diver to swim to production pipeline end and install the handling rigging (size: TBC) at approx. 10m from flange face at pipelines side. On the deck of DSV, riggers to rig up 1 x 10T diver\u2019s A-frame c\/w 5T x 3.5 m chain block and 2 taglines opposite from each other. The weight of the A-frame is approx. 1.0 MT each.<\/span><\/li>\n<li><span style=\"color: #000000;\">Crane to pick up the A-frame by crane and slew to STBD side. Lower the frame into the water slowly.<\/span><\/li>\n<li><span style=\"color: #000000;\">Diver to move in and guide the frame to location when it is approx. 3 m above seabed over the production pipeline.\u00a0<strong>Note:<\/strong> Attention to be paid to umbilical management whilst guiding \/ lowering A-frame by diver. Diver to confirm A-frame is in position, stable and horizontal by eye sight. Crane to slack and diver to release the crane hook. Deck to recover crane hook.<\/span><\/li>\n<li><span style=\"color: #000000;\">Diver to connect the chain block to the handling rigging.<\/span><\/li>\n<li><span style=\"color: #000000;\">Diver to pull-in the chain block to lift up the production pipeline from seabed.<\/span><\/li>\n<li><span style=\"color: #000000;\">Diver to release the residual hydrotest pressure inside the pipeline through the diffuser installed at the blind flange. After the pressure has been released, diver to remove the blind flange by nut splitter (size TBC).<\/span><\/li>\n<li><span style=\"color: #000000;\">Diver to connect crane to the spool with the crane stinger.\u00a0<strong>Refer to drawing no. <\/strong><strong>12012-AMC-DUA-ME-DW-2050-01<\/strong><\/span><\/li>\n<li><span style=\"color: #000000;\">Diver to instruct the crane to bring the spool nearer to flange face until the alignment of bolt holes\u00a0 of the tie-in spool flange are in good position for bolt insertion. Pre-installed air bags may be used to facilitate the alignment.<\/span><\/li>\n<li><span style=\"color: #000000;\">Diver to install the flange pulling device (3 MT) comealong at 3 &amp; 9 o\u2019clock bolth hole and reaction force jig at pipeline flange.<\/span><\/li>\n<li><span style=\"color: #000000;\">Bring the spool flange face close to pipeline using the combination of crane movement and flange pull-in device as well as A-Frame installed to pipeline to adjust the elevation.<\/span><\/li>\n<li><span style=\"color: #000000;\">Diver to place and align the bolt holes by drift pins, then to insert bolts to any lower flange holes, where available. Bolts insertion for lower half of the flange will continue until flange connection is loosely secured.<\/span><\/li>\n<li><span style=\"color: #000000;\">When lower half of bolts and nuts are loosed secured, diver to remove drift pins.<\/span><\/li>\n<li><span style=\"color: #000000;\">Using fishing rope, diver to insert the gasket into the flange groove. Diver to also insert chemical bundle (Quantity: TBC).\u00a0<strong>Refer to Appendix C for MSDS.<\/strong><\/span><\/li>\n<li><span style=\"color: #000000;\">Diver to continue to insert upper half bolts and hand tighten up all the nuts. Meanwhile, carefully check to ensure the ring gasket is in proper position.<\/span><\/li>\n<li><span style=\"color: #000000;\">When all of the bolts &amp; nuts are installed and hand tightened in position, diver to proceed to hydraulic bolt tensioning operation.\u00a0<strong>Refer Appendix E for bolt tensioning procedure\/data sheet.<\/strong><\/span><\/li>\n<li><span style=\"color: #000000;\">De-rig the lift rigging from the spool and recover the rigging to the deck.<\/span><\/li>\n<li><span style=\"color: #000000;\">Remove the beacon on the spool and recover the diver to diving bell. Ensure there are no obstruction\/ debris at production pipeline tie-in spool location.<\/span><\/li>\n<\/ul>\n<p><span style=\"color: #000000;\"><u>Pigging\/Gas Lift Pipeline Tie-In Spool Installation @ TPAM<\/u><\/span><\/p>\n<ul>\n<li><span style=\"color: #000000;\">Upon completion of 10\u2019\u2019 production tie-in spool, DSV to move out of the subsea assets to receive the spool barge in bow to stern configuration and secured.\u00a0<strong>Refer to drawing nos.:\u00a0<\/strong><strong>12012-AMC-DUA-ME-DW-2045-01<\/strong><\/span><\/li>\n<li><span style=\"color: #000000;\">Repeat steps 2 to 11 in sub-task #2.1 &amp; all steps in sub-task #2.2 for 10\u2019\u2019 pigging\/gas lift tie-in @ TPAM end.<strong>Refer to drawing nos.:<\/strong><\/span><span style=\"color: #000000;\"><strong>12012-AMC-DUA-ME-DW-2045-02<\/strong><\/span>\n<p><span style=\"color: #000000;\"><strong>12012-AMC-DUA-ME-DW-2045-03<\/strong><\/span><\/p>\n<p><span style=\"color: #000000;\"><strong>12012-AMC-DUA-ME-DW-2045-04<\/strong><\/span><\/p>\n<p><span style=\"color: #000000;\"><strong>12012-AMC-DUA-ME-DW-2037<\/strong><\/span><\/p>\n<p><span style=\"color: #000000;\"><strong>12012-AMC-DUA-ME-DW-2049<\/strong><\/span><\/li>\n<li><span style=\"color: #000000;\">Repeat all the steps in sub-task #2.3 for 10\u2019\u2019 pigging\/gas lift tie-in @ Pipeline end.<\/span><span style=\"color: #000000;\"><strong>Refer to drawing nos.:<\/strong><\/span>\n<p><span style=\"color: #000000;\"><strong>12012-AMC-DUA-ME-DW-2050-02<\/strong><\/span><\/li>\n<li><span style=\"color: #000000;\">Take fixes at following spots for surveyor to draw the as-built of the spools:<\/span><span style=\"color: #000000;\">a)\u00a0\u00a0\u00a0\u00a0 Flange connections<\/span>\n<p><span style=\"color: #000000;\">b)\u00a0\u00a0\u00a0 Start of bend<\/span><\/p>\n<p><span style=\"color: #000000;\">c)\u00a0\u00a0\u00a0\u00a0 End of bend<\/span><\/p>\n<p><span style=\"color: #000000;\">Recover the ROV once the surveyor does not require additional data.<\/span><\/li>\n<\/ul>\n","protected":false},"excerpt":{"rendered":"<p>&nbsp; COMPANY: EMAS-AMC PROJECT TITLE: Chim Sao Field Development CLIENT:\u00a0Premier Oil Vietnam LOCATION:\u00a0Vietnam YEAR: 2014 VESSEL: Diving Support Vessel (DSV) Toisa Paladin SCOPE OF WORK: This document describes the 4 &hellip; <a class=\"readmore\" href=\"https:\/\/alfanso10.com\/?p=870\">Continue Reading \u2192<\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[23],"tags":[],"_links":{"self":[{"href":"https:\/\/alfanso10.com\/index.php?rest_route=\/wp\/v2\/posts\/870"}],"collection":[{"href":"https:\/\/alfanso10.com\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/alfanso10.com\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/alfanso10.com\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/alfanso10.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=870"}],"version-history":[{"count":14,"href":"https:\/\/alfanso10.com\/index.php?rest_route=\/wp\/v2\/posts\/870\/revisions"}],"predecessor-version":[{"id":1358,"href":"https:\/\/alfanso10.com\/index.php?rest_route=\/wp\/v2\/posts\/870\/revisions\/1358"}],"wp:attachment":[{"href":"https:\/\/alfanso10.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=870"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/alfanso10.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=870"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/alfanso10.com\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=870"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}