Skip to content

A Knowledge Shared is A Knowledge Gained

  • Linkedin

Primary menu

  • Home
  • About Website
    • Acknowledgement
  • About Author
    • Career Goals
    • Things Enjoy Being/Doing Offshore
    • Things Hate Being/Doing Offshore
    • Things Enjoy Being/Doing Onshore
    • Things Hate Being/Doing Onshore
    • Things I get Nervous about offshore
    • Worst Moments
    • Best Memories
    • Legacy
  • Offshore Installation Engineer
    • Who Are We
    • Job Description
    • Offshore Organogram
    • Courses
    • Things need To Bring Offshore
    • Travelling Offshore
    • 11 – Things You need To Have When Going on Deck of Barge/Vessel
    • Famous Quote
    • Career Path
  • Offshore Construction
    • Structure Installation
    • Subsea Structure Installation
    • Rigid Pipeline Installation
    • FPSO Installation
    • Flowline Installation
    • Cable Installation
    • Pre-Commisioning
    • De-Commisioning
    • Subsea Works
    • Acronym
    • Codes
    • Books
  • My Experience
    • Structure Installation Experience
    • Subsea Structure Installation Experience
    • Rigid Pipeline Installation Experience
    • FPSO Installation Experience
    • Flowline Installation Experience
    • Cable Installation Experience
    • Pre-Commissioning Experience
    • De-Commisioning Experience
    • Subsea Works Experience
  • Contact

Category: Books

OIL AND GAS PRODUCTION HANDBOOK – BY HAVARD DEVOLD – JUNE 2006

  • By admin
  • December 3, 2005
  • Comments Off on OIL AND GAS PRODUCTION HANDBOOK – BY HAVARD DEVOLD – JUNE 2006

OIL AND GAS PRODUCTION HANDBOOK – BY HAVARD DEVOLD - JUNE 2006

PIPELINE RULES OF THUMB HANDBOOK

  • By admin
  • November 2, 2005
  • Comments Off on PIPELINE RULES OF THUMB HANDBOOK

  PIPELINE RULES OF THUMB HANDBOOK FILE IS BIGGER THAN 8MB. NOT SURE HOW TO UPLOAD IT

SUBMARINE POWER CABLES – BY THOMAS WORZYK – 2009

  • By admin
  • October 4, 2005
  • Comments Off on SUBMARINE POWER CABLES – BY THOMAS WORZYK – 2009

SUBMARINE POWER CABLES – BY THOMAS WORZYK - 2009

Recent Posts

  • EPIC for Power Supply Project through Submarine Cables from Ras Laffan to Halul Island
  • 8” Jumper Installation
  • 12” & 4.5” Pipeline End Termination (PLET)
  • Liwan Deepwater Project
  • GAZA FSO (Slough Replacement)
Copyright © 2023 . All Rights Reserved.
Powered by: WordPress | Theme: Simple Catch